Residential construction wages: Bibb, Georgia
Wage determination GA20260027 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/GA20260027 on · latest revision 1 · verify at sam.gov/wage-determination/GA20260027/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADER | $28.32 | $13.45 | $41.77 |
| SHEET METAL: EXCLUDING HVAC DUCT INSTALLATION: (BUILDINGS OVER 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 |
| SHEET META: EXCLUDING HVAC DUCT INSTALLATION (BUILDINGS UP TO 100,000 SQUARE FEET) | $25.49 | $11.73 | $37.22 |
| TRUCK DRIVER | $12.17 | $0.83 | $13.00 |
| ROOFER | $9.47 | $0.00 | $9.47 |
| PLUMBER | $10.86 | $0.00 | $10.86 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $8.63 | $0.00 | $8.63 |
| OPERATOR: EXCAVATOR | $8.96 | $0.00 | $8.96 |
| OPERATOR: BULLDOZER | $13.66 | $3.05 | $16.71 |
| LABORER: MASON TENDER | $8.00 | $0.00 | $8.00 |
| LABORER: COMMON OR GENERAL | $7.25 | $0.00 | $7.25 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $11.06 | $0.00 | $11.06 |
| ELECTRICIAN | $13.77 | $0.00 | $13.77 |
| CEMENT MASON/CONCRETE FINISHER | $13.02 | $3.52 | $16.54 |
| CARPENTER, INCLUDING DRYWALL HANGING | $10.00 | $0.00 | $10.00 |
| BRICKLAYER | $13.83 | $0.00 | $13.83 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.