Bristol County, Rhode Island: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building RI20260001 rev 3
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 |
| ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 |
| BOILERMAKER | $50.62 | $28.82 | $79.44 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER | $46.86 | $29.14 | $76.00 |
| MARBLE SETTER, TERRAZZO WORKER & TILE SETTER | $46.54 | $30.34 | $76.88 |
| MARBLE, TILE & TERRAZZO FINISHER | $38.78 | $29.61 | $68.39 |
| PILEDRIVER | $41.53 | $29.35 | $70.88 |
| WELDER | $48.68 | $30.50 | $79.18 |
| DIVER TENDER | $48.68 | $30.50 | $79.18 |
| DIVER | $60.83 | $30.50 | $91.33 |
| CARPENTER: INCLUDES SOFT FLOOR LAYER | $47.88 | $30.50 | $78.38 |
| MILLWRIGHT | $45.72 | $31.50 | $77.22 |
| TELEDATA SYSTEM INSTALLER | $42.09 | $19.71 | $61.80 |
| ELECTRICIAN | $56.11 | $24.74 | $80.85 |
| ELEVATOR MECHANIC | $64.52 | $38.44 | $102.96 |
| IRONWORKER | $43.03 | $33.53 | $76.56 |
| LABORER GROUP 5 (BUILDING CONSTRUCTION) | $39.00 | $26.90 | $65.90 |
| LABORER GROUP 4 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER GROUP 3 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER GROUP 2 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER GROUP 1 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER TEST BORING LABORER | $41.95 | $24.15 | $66.10 |
| LABORER TEST BORING DRILLER | $41.95 | $24.15 | $66.10 |
| LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW TOP MAN & LABORER | $35.60 | $24.15 | $59.75 |
| LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN | $41.50 | $24.15 | $65.65 |
| LABORER FREE AIR GROUP 3 | $42.45 | $24.15 | $66.60 |
| LABORER FREE AIR GROUP 2 | $45.00 | $24.15 | $69.15 |
| LABORER FREE AIR GROUP 1 | $46.00 | $24.15 | $70.15 |
| LABORER COMPRESSED AIR GROUP 3 | $42.45 | $24.15 | $66.60 |
| LABORER COMPRESSED AIR GROUP 2 | $52.93 | $24.15 | $77.08 |
| LABORER COMPRESSED AIR GROUP 1 | $55.40 | $24.15 | $79.55 |
| PAINTER (SPRAY, SAND & WATER BLASTING) | $42.57 | $26.60 | $69.17 |
| PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE & STRUCTURAL STEEL) | $41.57 | $26.60 | $68.17 |
| PAINTER (BRUSH AND ROLLER) | $39.57 | $26.60 | $66.17 |
| GLAZIER | $41.63 | $26.15 | $67.78 |
| PAINTER (BRIDGE WORK) | $57.85 | $26.40 | $84.25 |
| SIGN PAINTER | $24.79 | $13.72 | $38.51 |
| CEMENT MASON/CONCRETE FINISHER (BUILDING CONSTRUCTION) | $44.75 | $29.10 | $73.85 |
| CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION) | $44.75 | $29.10 | $73.85 |
| PLASTERER | $45.52 | $29.43 | $74.95 |
| PLUMBERS AND PIPEFITTERS | $54.34 | $34.50 | $88.84 |
| ROOFER | $47.49 | $31.44 | $78.93 |
| SPRINKLER FITTER | $53.76 | $33.44 | $87.20 |
| SHEET METAL WORKER | $44.42 | $41.94 | $86.36 |
POWER EQUIPMENT OPERATOR 25 classifications · $55.70 to $81.25 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 9 BOAT & TUG OPERATOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.92 | $29.95 | $78.87 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR COMPRESSOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $45.00 | $29.95 | $74.95 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $33.15 | $29.95 | $63.10 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 6 WELL-POINT INSTALLATION CREW. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $39.15 | $29.95 | $69.10 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER LOADER, TRACTOR, SCRAPER, COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD. CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.35 | $29.95 | $78.30 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 4 OILER ON CRAWLER BACKHOE. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $42.07 | $29.95 | $72.02 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 3 OILERS ON CRANES. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $44.92 | $29.95 | $74.87 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, GRADERS, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS, FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE PLANTS. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $49.30 | $29.95 | $79.25 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $51.30 | $29.95 | $81.25 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMPRESSOR A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $44.54 | $29.95 | $74.49 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7 WELL POINT INSTALLATION CREW A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $47.22 | $29.95 | $77.17 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS. CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP) A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $47.65 | $29.95 | $77.60 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5 OILER ON CRAWLER BACKHOE A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $41.50 | $29.95 | $71.45 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4 FIREMAN & OILER ON CRANES A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $44.35 | $29.95 | $74.30 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.35 | $29.95 | $78.30 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM TRUCK A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.57 | $29.95 | $78.52 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $50.57 | $29.95 | $80.52 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS A | $38.70 | $29.95 | $68.65 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7 COMBINATION LOADER / BACKHOES, FRONT-END LOADERS (LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS, BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS, OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES A | $43.43 | $29.95 | $73.38 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6 OILERS ON CRANES AND DECKHANDS A | $39.73 | $29.95 | $69.68 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5 SIGNAL PERSONS A | $33.15 | $29.95 | $63.10 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4 UTILITY ENGINEERS A | $25.75 | $29.95 | $55.70 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3 WELLPOINT INSTALLATION AND DRILL/BORING MACHINE ASSISTANTS A | $39.15 | $29.95 | $69.10 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2 DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS, FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK, DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS, CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER MACHINES, ROTATING TELEHANDLERS, SPMT TYPE EQUIPMENT A | $44.45 | $29.95 | $74.40 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1 CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS, HOISTS, DERRICKS A | $46.45 | $29.95 | $76.40 |
TRUCK DRIVER 10 classifications · $66.37 to $67.32 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 FOUR- AND FIVE-AXLE EQUIPMENT | $32.21 | $34.51 | $66.72 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 10 TRACTOR TRAILER | $32.36 | $34.51 | $66.87 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.56 | $34.51 | $67.07 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.31 | $34.51 | $66.82 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 TRAILERS) | $32.81 | $34.51 | $67.32 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.61 | $34.51 | $67.12 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.11 | $34.51 | $66.62 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.06 | $34.51 | $66.57 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.01 | $34.51 | $66.52 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $31.86 | $34.51 | $66.37 |
Heavy RI20260001 rev 3
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 |
| ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 |
| BOILERMAKER | $50.62 | $28.82 | $79.44 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER | $46.86 | $29.14 | $76.00 |
| MARBLE SETTER, TERRAZZO WORKER & TILE SETTER | $46.54 | $30.34 | $76.88 |
| MARBLE, TILE & TERRAZZO FINISHER | $38.78 | $29.61 | $68.39 |
| PILEDRIVER | $41.53 | $29.35 | $70.88 |
| WELDER | $48.68 | $30.50 | $79.18 |
| DIVER TENDER | $48.68 | $30.50 | $79.18 |
| DIVER | $60.83 | $30.50 | $91.33 |
| CARPENTER: INCLUDES SOFT FLOOR LAYER | $47.88 | $30.50 | $78.38 |
| MILLWRIGHT | $45.72 | $31.50 | $77.22 |
| TELEDATA SYSTEM INSTALLER | $42.09 | $19.71 | $61.80 |
| ELECTRICIAN | $56.11 | $24.74 | $80.85 |
| ELEVATOR MECHANIC | $64.52 | $38.44 | $102.96 |
| IRONWORKER | $43.03 | $33.53 | $76.56 |
| LABORER GROUP 5 (BUILDING CONSTRUCTION) | $39.00 | $26.90 | $65.90 |
| LABORER GROUP 4 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER GROUP 3 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER GROUP 2 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER GROUP 1 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER TEST BORING LABORER | $41.95 | $24.15 | $66.10 |
| LABORER TEST BORING DRILLER | $41.95 | $24.15 | $66.10 |
| LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW TOP MAN & LABORER | $35.60 | $24.15 | $59.75 |
| LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN | $41.50 | $24.15 | $65.65 |
| LABORER FREE AIR GROUP 3 | $42.45 | $24.15 | $66.60 |
| LABORER FREE AIR GROUP 2 | $45.00 | $24.15 | $69.15 |
| LABORER FREE AIR GROUP 1 | $46.00 | $24.15 | $70.15 |
| LABORER COMPRESSED AIR GROUP 3 | $42.45 | $24.15 | $66.60 |
| LABORER COMPRESSED AIR GROUP 2 | $52.93 | $24.15 | $77.08 |
| LABORER COMPRESSED AIR GROUP 1 | $55.40 | $24.15 | $79.55 |
| PAINTER (SPRAY, SAND & WATER BLASTING) | $42.57 | $26.60 | $69.17 |
| PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE & STRUCTURAL STEEL) | $41.57 | $26.60 | $68.17 |
| PAINTER (BRUSH AND ROLLER) | $39.57 | $26.60 | $66.17 |
| GLAZIER | $41.63 | $26.15 | $67.78 |
| PAINTER (BRIDGE WORK) | $57.85 | $26.40 | $84.25 |
| SIGN PAINTER | $24.79 | $13.72 | $38.51 |
| CEMENT MASON/CONCRETE FINISHER (BUILDING CONSTRUCTION) | $44.75 | $29.10 | $73.85 |
| CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION) | $44.75 | $29.10 | $73.85 |
| PLASTERER | $45.52 | $29.43 | $74.95 |
| PLUMBERS AND PIPEFITTERS | $54.34 | $34.50 | $88.84 |
| ROOFER | $47.49 | $31.44 | $78.93 |
| SPRINKLER FITTER | $53.76 | $33.44 | $87.20 |
| SHEET METAL WORKER | $44.42 | $41.94 | $86.36 |
POWER EQUIPMENT OPERATOR 25 classifications · $55.70 to $81.25 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 9 BOAT & TUG OPERATOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.92 | $29.95 | $78.87 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR COMPRESSOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $45.00 | $29.95 | $74.95 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $33.15 | $29.95 | $63.10 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 6 WELL-POINT INSTALLATION CREW. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $39.15 | $29.95 | $69.10 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER LOADER, TRACTOR, SCRAPER, COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD. CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.35 | $29.95 | $78.30 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 4 OILER ON CRAWLER BACKHOE. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $42.07 | $29.95 | $72.02 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 3 OILERS ON CRANES. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $44.92 | $29.95 | $74.87 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, GRADERS, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS, FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE PLANTS. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $49.30 | $29.95 | $79.25 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $51.30 | $29.95 | $81.25 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMPRESSOR A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $44.54 | $29.95 | $74.49 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7 WELL POINT INSTALLATION CREW A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $47.22 | $29.95 | $77.17 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS. CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP) A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $47.65 | $29.95 | $77.60 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5 OILER ON CRAWLER BACKHOE A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $41.50 | $29.95 | $71.45 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4 FIREMAN & OILER ON CRANES A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $44.35 | $29.95 | $74.30 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.35 | $29.95 | $78.30 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM TRUCK A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.57 | $29.95 | $78.52 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $50.57 | $29.95 | $80.52 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS A | $38.70 | $29.95 | $68.65 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7 COMBINATION LOADER / BACKHOES, FRONT-END LOADERS (LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS, BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS, OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES A | $43.43 | $29.95 | $73.38 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6 OILERS ON CRANES AND DECKHANDS A | $39.73 | $29.95 | $69.68 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5 SIGNAL PERSONS A | $33.15 | $29.95 | $63.10 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4 UTILITY ENGINEERS A | $25.75 | $29.95 | $55.70 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3 WELLPOINT INSTALLATION AND DRILL/BORING MACHINE ASSISTANTS A | $39.15 | $29.95 | $69.10 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2 DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS, FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK, DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS, CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER MACHINES, ROTATING TELEHANDLERS, SPMT TYPE EQUIPMENT A | $44.45 | $29.95 | $74.40 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1 CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS, HOISTS, DERRICKS A | $46.45 | $29.95 | $76.40 |
TRUCK DRIVER 10 classifications · $66.37 to $67.32 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 FOUR- AND FIVE-AXLE EQUIPMENT | $32.21 | $34.51 | $66.72 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 10 TRACTOR TRAILER | $32.36 | $34.51 | $66.87 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.56 | $34.51 | $67.07 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.31 | $34.51 | $66.82 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 TRAILERS) | $32.81 | $34.51 | $67.32 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.61 | $34.51 | $67.12 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.11 | $34.51 | $66.62 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.06 | $34.51 | $66.57 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.01 | $34.51 | $66.52 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $31.86 | $34.51 | $66.37 |
Highway RI20260001 rev 3
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 |
| ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 |
| BOILERMAKER | $50.62 | $28.82 | $79.44 |
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER | $46.86 | $29.14 | $76.00 |
| MARBLE SETTER, TERRAZZO WORKER & TILE SETTER | $46.54 | $30.34 | $76.88 |
| MARBLE, TILE & TERRAZZO FINISHER | $38.78 | $29.61 | $68.39 |
| PILEDRIVER | $41.53 | $29.35 | $70.88 |
| WELDER | $48.68 | $30.50 | $79.18 |
| DIVER TENDER | $48.68 | $30.50 | $79.18 |
| DIVER | $60.83 | $30.50 | $91.33 |
| CARPENTER: INCLUDES SOFT FLOOR LAYER | $47.88 | $30.50 | $78.38 |
| MILLWRIGHT | $45.72 | $31.50 | $77.22 |
| TELEDATA SYSTEM INSTALLER | $42.09 | $19.71 | $61.80 |
| ELECTRICIAN | $56.11 | $24.74 | $80.85 |
| ELEVATOR MECHANIC | $64.52 | $38.44 | $102.96 |
| IRONWORKER | $43.03 | $33.53 | $76.56 |
| LABORER GROUP 5 (BUILDING CONSTRUCTION) | $39.00 | $26.90 | $65.90 |
| LABORER GROUP 4 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER GROUP 3 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER GROUP 2 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER GROUP 1 (BUILDING CONSTRUCTION) | $37.00 | $26.90 | $63.90 |
| LABORER TEST BORING LABORER | $41.95 | $24.15 | $66.10 |
| LABORER TEST BORING DRILLER | $41.95 | $24.15 | $66.10 |
| LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW TOP MAN & LABORER | $35.60 | $24.15 | $59.75 |
| LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN | $41.50 | $24.15 | $65.65 |
| LABORER FREE AIR GROUP 3 | $42.45 | $24.15 | $66.60 |
| LABORER FREE AIR GROUP 2 | $45.00 | $24.15 | $69.15 |
| LABORER FREE AIR GROUP 1 | $46.00 | $24.15 | $70.15 |
| LABORER COMPRESSED AIR GROUP 3 | $42.45 | $24.15 | $66.60 |
| LABORER COMPRESSED AIR GROUP 2 | $52.93 | $24.15 | $77.08 |
| LABORER COMPRESSED AIR GROUP 1 | $55.40 | $24.15 | $79.55 |
| PAINTER (SPRAY, SAND & WATER BLASTING) | $42.57 | $26.60 | $69.17 |
| PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE & STRUCTURAL STEEL) | $41.57 | $26.60 | $68.17 |
| PAINTER (BRUSH AND ROLLER) | $39.57 | $26.60 | $66.17 |
| GLAZIER | $41.63 | $26.15 | $67.78 |
| PAINTER (BRIDGE WORK) | $57.85 | $26.40 | $84.25 |
| SIGN PAINTER | $24.79 | $13.72 | $38.51 |
| CEMENT MASON/CONCRETE FINISHER (BUILDING CONSTRUCTION) | $44.75 | $29.10 | $73.85 |
| CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION) | $44.75 | $29.10 | $73.85 |
| PLASTERER | $45.52 | $29.43 | $74.95 |
| PLUMBERS AND PIPEFITTERS | $54.34 | $34.50 | $88.84 |
| ROOFER | $47.49 | $31.44 | $78.93 |
| SPRINKLER FITTER | $53.76 | $33.44 | $87.20 |
| SHEET METAL WORKER | $44.42 | $41.94 | $86.36 |
POWER EQUIPMENT OPERATOR 25 classifications · $55.70 to $81.25 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 9 BOAT & TUG OPERATOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.92 | $29.95 | $78.87 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR COMPRESSOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $45.00 | $29.95 | $74.95 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $33.15 | $29.95 | $63.10 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 6 WELL-POINT INSTALLATION CREW. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $39.15 | $29.95 | $69.10 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER LOADER, TRACTOR, SCRAPER, COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD. CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.35 | $29.95 | $78.30 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 4 OILER ON CRAWLER BACKHOE. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $42.07 | $29.95 | $72.02 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 3 OILERS ON CRANES. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $44.92 | $29.95 | $74.87 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, GRADERS, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS, FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE PLANTS. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $49.30 | $29.95 | $79.25 |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $51.30 | $29.95 | $81.25 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMPRESSOR A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $44.54 | $29.95 | $74.49 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7 WELL POINT INSTALLATION CREW A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $47.22 | $29.95 | $77.17 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS. CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP) A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $47.65 | $29.95 | $77.60 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5 OILER ON CRAWLER BACKHOE A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $41.50 | $29.95 | $71.45 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4 FIREMAN & OILER ON CRANES A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $44.35 | $29.95 | $74.30 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.35 | $29.95 | $78.30 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM TRUCK A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $48.57 | $29.95 | $78.52 |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A | $50.57 | $29.95 | $80.52 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS A | $38.70 | $29.95 | $68.65 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7 COMBINATION LOADER / BACKHOES, FRONT-END LOADERS (LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS, BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS, OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES A | $43.43 | $29.95 | $73.38 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6 OILERS ON CRANES AND DECKHANDS A | $39.73 | $29.95 | $69.68 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5 SIGNAL PERSONS A | $33.15 | $29.95 | $63.10 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4 UTILITY ENGINEERS A | $25.75 | $29.95 | $55.70 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3 WELLPOINT INSTALLATION AND DRILL/BORING MACHINE ASSISTANTS A | $39.15 | $29.95 | $69.10 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2 DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS, FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK, DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS, CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER MACHINES, ROTATING TELEHANDLERS, SPMT TYPE EQUIPMENT A | $44.45 | $29.95 | $74.40 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1 CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS, HOISTS, DERRICKS A | $46.45 | $29.95 | $76.40 |
TRUCK DRIVER 10 classifications · $66.37 to $67.32 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 FOUR- AND FIVE-AXLE EQUIPMENT | $32.21 | $34.51 | $66.72 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 10 TRACTOR TRAILER | $32.36 | $34.51 | $66.87 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.56 | $34.51 | $67.07 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.31 | $34.51 | $66.82 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 TRAILERS) | $32.81 | $34.51 | $67.32 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.61 | $34.51 | $67.12 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.11 | $34.51 | $66.62 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.06 | $34.51 | $66.57 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $32.01 | $34.51 | $66.52 |
| TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP | $31.86 | $34.51 | $66.37 |
Residential RI20260002 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| INSULATOR - PIPE & PIPEWRAPPER (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 |
| ELECTRICIAN | $42.09 | $17.92 | $60.01 |
| ELEVATOR MECHANIC | $64.52 | $38.44 | $102.96 |
| POWER EQUIPMENT OPERATOR: PAVER A | $40.82 | $28.25 | $69.07 |
| POWER EQUIPMENT OPERATOR: GRADER AND ROLLER A | $39.90 | $28.25 | $68.15 |
| ROOFER | $47.49 | $31.44 | $78.93 |
| SPRINKLER FITTER | $24.24 | $9.81 | $34.05 |
| POWER EQUIPMENT OPERATOR (BACKHOE) | $20.27 | $8.98 | $29.25 |
| PLUMBER | $23.96 | $8.95 | $32.91 |
| PLASTERER | $13.50 | $2.45 | $15.95 |
| PAINTER (BRUSH AND ROLLER) | $20.55 | $8.50 | $29.05 |
| LABORER (UNSKILLED, LANDSCAPE, & BRICK MASON TENDER) | $18.47 | $8.10 | $26.57 |
| INSULATOR - BATT | $19.56 | $9.65 | $29.21 |
| FLOOR LAYER: CARPET | $15.62 | $9.65 | $25.27 |
| DRYWALL FINISHER/TAPER | $20.55 | $8.50 | $29.05 |
| CEMENT MASON/FINISHER | $20.45 | $11.40 | $31.85 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, & METAL STUD FRAMING) | $15.32 | $9.65 | $24.97 |
| BRICKLAYER | $20.45 | $11.40 | $31.85 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.