Building RI20260001 rev 3

ClassificationRateFringeTotal
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)$49.91$36.63$86.54
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$49.91$36.63$86.54
BOILERMAKER$50.62$28.82$79.44
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER$46.86$29.14$76.00
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER$46.54$30.34$76.88
MARBLE, TILE & TERRAZZO FINISHER$38.78$29.61$68.39
PILEDRIVER$41.53$29.35$70.88
WELDER$48.68$30.50$79.18
DIVER TENDER$48.68$30.50$79.18
DIVER$60.83$30.50$91.33
CARPENTER: INCLUDES SOFT FLOOR LAYER$47.88$30.50$78.38
MILLWRIGHT$45.72$31.50$77.22
TELEDATA SYSTEM INSTALLER$42.09$19.71$61.80
ELECTRICIAN$56.11$24.74$80.85
ELEVATOR MECHANIC$64.52$38.44$102.96
IRONWORKER$43.03$33.53$76.56
LABORER GROUP 5 (BUILDING CONSTRUCTION)$39.00$26.90$65.90
LABORER GROUP 4 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER GROUP 3 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER GROUP 2 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER GROUP 1 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER TEST BORING LABORER$41.95$24.15$66.10
LABORER TEST BORING DRILLER$41.95$24.15$66.10
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW TOP MAN & LABORER$35.60$24.15$59.75
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN$41.50$24.15$65.65
LABORER FREE AIR GROUP 3$42.45$24.15$66.60
LABORER FREE AIR GROUP 2$45.00$24.15$69.15
LABORER FREE AIR GROUP 1$46.00$24.15$70.15
LABORER COMPRESSED AIR GROUP 3$42.45$24.15$66.60
LABORER COMPRESSED AIR GROUP 2$52.93$24.15$77.08
LABORER COMPRESSED AIR GROUP 1$55.40$24.15$79.55
PAINTER (SPRAY, SAND & WATER BLASTING)$42.57$26.60$69.17
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE & STRUCTURAL STEEL)$41.57$26.60$68.17
PAINTER (BRUSH AND ROLLER)$39.57$26.60$66.17
GLAZIER$41.63$26.15$67.78
PAINTER (BRIDGE WORK)$57.85$26.40$84.25
SIGN PAINTER$24.79$13.72$38.51
CEMENT MASON/CONCRETE FINISHER (BUILDING CONSTRUCTION)$44.75$29.10$73.85
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION)$44.75$29.10$73.85
PLASTERER$45.52$29.43$74.95
PLUMBERS AND PIPEFITTERS$54.34$34.50$88.84
ROOFER$47.49$31.44$78.93
SPRINKLER FITTER$53.76$33.44$87.20
SHEET METAL WORKER$44.42$41.94$86.36
POWER EQUIPMENT OPERATOR 25 classifications · $55.70 to $81.25 total
ClassificationRateFringeTotal
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 9 BOAT & TUG OPERATOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.92$29.95$78.87
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR COMPRESSOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$45.00$29.95$74.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$33.15$29.95$63.10
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 6 WELL-POINT INSTALLATION CREW. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$39.15$29.95$69.10
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER LOADER, TRACTOR, SCRAPER, COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD. CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.35$29.95$78.30
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 4 OILER ON CRAWLER BACKHOE. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$42.07$29.95$72.02
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 3 OILERS ON CRANES. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$44.92$29.95$74.87
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, GRADERS, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS, FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE PLANTS. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$49.30$29.95$79.25
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$51.30$29.95$81.25
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMPRESSOR A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$44.54$29.95$74.49
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7 WELL POINT INSTALLATION CREW A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$47.22$29.95$77.17
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS. CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP) A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$47.65$29.95$77.60
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5 OILER ON CRAWLER BACKHOE A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$41.50$29.95$71.45
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4 FIREMAN & OILER ON CRANES A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$44.35$29.95$74.30
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.35$29.95$78.30
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM TRUCK A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.57$29.95$78.52
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$50.57$29.95$80.52
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS A$38.70$29.95$68.65
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7 COMBINATION LOADER / BACKHOES, FRONT-END LOADERS (LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS, BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS, OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES A$43.43$29.95$73.38
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6 OILERS ON CRANES AND DECKHANDS A$39.73$29.95$69.68
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5 SIGNAL PERSONS A$33.15$29.95$63.10
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4 UTILITY ENGINEERS A$25.75$29.95$55.70
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3 WELLPOINT INSTALLATION AND DRILL/BORING MACHINE ASSISTANTS A$39.15$29.95$69.10
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2 DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS, FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK, DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS, CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER MACHINES, ROTATING TELEHANDLERS, SPMT TYPE EQUIPMENT A$44.45$29.95$74.40
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1 CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS, HOISTS, DERRICKS A$46.45$29.95$76.40
TRUCK DRIVER 10 classifications · $66.37 to $67.32 total
ClassificationRateFringeTotal
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 FOUR- AND FIVE-AXLE EQUIPMENT$32.21$34.51$66.72
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 10 TRACTOR TRAILER$32.36$34.51$66.87
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.56$34.51$67.07
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.31$34.51$66.82
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 TRAILERS)$32.81$34.51$67.32
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.61$34.51$67.12
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.11$34.51$66.62
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.06$34.51$66.57
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.01$34.51$66.52
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$31.86$34.51$66.37

Heavy RI20260001 rev 3

ClassificationRateFringeTotal
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)$49.91$36.63$86.54
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$49.91$36.63$86.54
BOILERMAKER$50.62$28.82$79.44
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER$46.86$29.14$76.00
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER$46.54$30.34$76.88
MARBLE, TILE & TERRAZZO FINISHER$38.78$29.61$68.39
PILEDRIVER$41.53$29.35$70.88
WELDER$48.68$30.50$79.18
DIVER TENDER$48.68$30.50$79.18
DIVER$60.83$30.50$91.33
CARPENTER: INCLUDES SOFT FLOOR LAYER$47.88$30.50$78.38
MILLWRIGHT$45.72$31.50$77.22
TELEDATA SYSTEM INSTALLER$42.09$19.71$61.80
ELECTRICIAN$56.11$24.74$80.85
ELEVATOR MECHANIC$64.52$38.44$102.96
IRONWORKER$43.03$33.53$76.56
LABORER GROUP 5 (BUILDING CONSTRUCTION)$39.00$26.90$65.90
LABORER GROUP 4 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER GROUP 3 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER GROUP 2 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER GROUP 1 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER TEST BORING LABORER$41.95$24.15$66.10
LABORER TEST BORING DRILLER$41.95$24.15$66.10
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW TOP MAN & LABORER$35.60$24.15$59.75
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN$41.50$24.15$65.65
LABORER FREE AIR GROUP 3$42.45$24.15$66.60
LABORER FREE AIR GROUP 2$45.00$24.15$69.15
LABORER FREE AIR GROUP 1$46.00$24.15$70.15
LABORER COMPRESSED AIR GROUP 3$42.45$24.15$66.60
LABORER COMPRESSED AIR GROUP 2$52.93$24.15$77.08
LABORER COMPRESSED AIR GROUP 1$55.40$24.15$79.55
PAINTER (SPRAY, SAND & WATER BLASTING)$42.57$26.60$69.17
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE & STRUCTURAL STEEL)$41.57$26.60$68.17
PAINTER (BRUSH AND ROLLER)$39.57$26.60$66.17
GLAZIER$41.63$26.15$67.78
PAINTER (BRIDGE WORK)$57.85$26.40$84.25
SIGN PAINTER$24.79$13.72$38.51
CEMENT MASON/CONCRETE FINISHER (BUILDING CONSTRUCTION)$44.75$29.10$73.85
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION)$44.75$29.10$73.85
PLASTERER$45.52$29.43$74.95
PLUMBERS AND PIPEFITTERS$54.34$34.50$88.84
ROOFER$47.49$31.44$78.93
SPRINKLER FITTER$53.76$33.44$87.20
SHEET METAL WORKER$44.42$41.94$86.36
POWER EQUIPMENT OPERATOR 25 classifications · $55.70 to $81.25 total
ClassificationRateFringeTotal
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 9 BOAT & TUG OPERATOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.92$29.95$78.87
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR COMPRESSOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$45.00$29.95$74.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$33.15$29.95$63.10
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 6 WELL-POINT INSTALLATION CREW. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$39.15$29.95$69.10
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER LOADER, TRACTOR, SCRAPER, COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD. CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.35$29.95$78.30
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 4 OILER ON CRAWLER BACKHOE. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$42.07$29.95$72.02
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 3 OILERS ON CRANES. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$44.92$29.95$74.87
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, GRADERS, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS, FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE PLANTS. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$49.30$29.95$79.25
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$51.30$29.95$81.25
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMPRESSOR A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$44.54$29.95$74.49
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7 WELL POINT INSTALLATION CREW A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$47.22$29.95$77.17
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS. CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP) A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$47.65$29.95$77.60
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5 OILER ON CRAWLER BACKHOE A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$41.50$29.95$71.45
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4 FIREMAN & OILER ON CRANES A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$44.35$29.95$74.30
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.35$29.95$78.30
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM TRUCK A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.57$29.95$78.52
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$50.57$29.95$80.52
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS A$38.70$29.95$68.65
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7 COMBINATION LOADER / BACKHOES, FRONT-END LOADERS (LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS, BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS, OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES A$43.43$29.95$73.38
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6 OILERS ON CRANES AND DECKHANDS A$39.73$29.95$69.68
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5 SIGNAL PERSONS A$33.15$29.95$63.10
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4 UTILITY ENGINEERS A$25.75$29.95$55.70
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3 WELLPOINT INSTALLATION AND DRILL/BORING MACHINE ASSISTANTS A$39.15$29.95$69.10
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2 DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS, FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK, DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS, CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER MACHINES, ROTATING TELEHANDLERS, SPMT TYPE EQUIPMENT A$44.45$29.95$74.40
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1 CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS, HOISTS, DERRICKS A$46.45$29.95$76.40
TRUCK DRIVER 10 classifications · $66.37 to $67.32 total
ClassificationRateFringeTotal
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 FOUR- AND FIVE-AXLE EQUIPMENT$32.21$34.51$66.72
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 10 TRACTOR TRAILER$32.36$34.51$66.87
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.56$34.51$67.07
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.31$34.51$66.82
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 TRAILERS)$32.81$34.51$67.32
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.61$34.51$67.12
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.11$34.51$66.62
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.06$34.51$66.57
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.01$34.51$66.52
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$31.86$34.51$66.37

Highway RI20260001 rev 3

ClassificationRateFringeTotal
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)$49.91$36.63$86.54
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$49.91$36.63$86.54
BOILERMAKER$50.62$28.82$79.44
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER$46.86$29.14$76.00
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER$46.54$30.34$76.88
MARBLE, TILE & TERRAZZO FINISHER$38.78$29.61$68.39
PILEDRIVER$41.53$29.35$70.88
WELDER$48.68$30.50$79.18
DIVER TENDER$48.68$30.50$79.18
DIVER$60.83$30.50$91.33
CARPENTER: INCLUDES SOFT FLOOR LAYER$47.88$30.50$78.38
MILLWRIGHT$45.72$31.50$77.22
TELEDATA SYSTEM INSTALLER$42.09$19.71$61.80
ELECTRICIAN$56.11$24.74$80.85
ELEVATOR MECHANIC$64.52$38.44$102.96
IRONWORKER$43.03$33.53$76.56
LABORER GROUP 5 (BUILDING CONSTRUCTION)$39.00$26.90$65.90
LABORER GROUP 4 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER GROUP 3 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER GROUP 2 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER GROUP 1 (BUILDING CONSTRUCTION)$37.00$26.90$63.90
LABORER TEST BORING LABORER$41.95$24.15$66.10
LABORER TEST BORING DRILLER$41.95$24.15$66.10
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW TOP MAN & LABORER$35.60$24.15$59.75
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN$41.50$24.15$65.65
LABORER FREE AIR GROUP 3$42.45$24.15$66.60
LABORER FREE AIR GROUP 2$45.00$24.15$69.15
LABORER FREE AIR GROUP 1$46.00$24.15$70.15
LABORER COMPRESSED AIR GROUP 3$42.45$24.15$66.60
LABORER COMPRESSED AIR GROUP 2$52.93$24.15$77.08
LABORER COMPRESSED AIR GROUP 1$55.40$24.15$79.55
PAINTER (SPRAY, SAND & WATER BLASTING)$42.57$26.60$69.17
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE & STRUCTURAL STEEL)$41.57$26.60$68.17
PAINTER (BRUSH AND ROLLER)$39.57$26.60$66.17
GLAZIER$41.63$26.15$67.78
PAINTER (BRIDGE WORK)$57.85$26.40$84.25
SIGN PAINTER$24.79$13.72$38.51
CEMENT MASON/CONCRETE FINISHER (BUILDING CONSTRUCTION)$44.75$29.10$73.85
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION)$44.75$29.10$73.85
PLASTERER$45.52$29.43$74.95
PLUMBERS AND PIPEFITTERS$54.34$34.50$88.84
ROOFER$47.49$31.44$78.93
SPRINKLER FITTER$53.76$33.44$87.20
SHEET METAL WORKER$44.42$41.94$86.36
POWER EQUIPMENT OPERATOR 25 classifications · $55.70 to $81.25 total
ClassificationRateFringeTotal
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 9 BOAT & TUG OPERATOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.92$29.95$78.87
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR COMPRESSOR. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$45.00$29.95$74.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$33.15$29.95$63.10
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 6 WELL-POINT INSTALLATION CREW. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$39.15$29.95$69.10
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER LOADER, TRACTOR, SCRAPER, COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD. CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.35$29.95$78.30
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 4 OILER ON CRAWLER BACKHOE. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$42.07$29.95$72.02
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 3 OILERS ON CRANES. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$44.92$29.95$74.87
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, GRADERS, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS, FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE PLANTS. A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$49.30$29.95$79.25
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$51.30$29.95$81.25
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMPRESSOR A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$44.54$29.95$74.49
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7 WELL POINT INSTALLATION CREW A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$47.22$29.95$77.17
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS. CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP) A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$47.65$29.95$77.60
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5 OILER ON CRAWLER BACKHOE A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$41.50$29.95$71.45
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4 FIREMAN & OILER ON CRANES A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$44.35$29.95$74.30
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.35$29.95$78.30
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM TRUCK A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$48.57$29.95$78.52
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A$50.57$29.95$80.52
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS A$38.70$29.95$68.65
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7 COMBINATION LOADER / BACKHOES, FRONT-END LOADERS (LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS, BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS, OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES A$43.43$29.95$73.38
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6 OILERS ON CRANES AND DECKHANDS A$39.73$29.95$69.68
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5 SIGNAL PERSONS A$33.15$29.95$63.10
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4 UTILITY ENGINEERS A$25.75$29.95$55.70
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3 WELLPOINT INSTALLATION AND DRILL/BORING MACHINE ASSISTANTS A$39.15$29.95$69.10
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2 DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS, FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK, DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS, CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER MACHINES, ROTATING TELEHANDLERS, SPMT TYPE EQUIPMENT A$44.45$29.95$74.40
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1 CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS, HOISTS, DERRICKS A$46.45$29.95$76.40
TRUCK DRIVER 10 classifications · $66.37 to $67.32 total
ClassificationRateFringeTotal
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 FOUR- AND FIVE-AXLE EQUIPMENT$32.21$34.51$66.72
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 10 TRACTOR TRAILER$32.36$34.51$66.87
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.56$34.51$67.07
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.31$34.51$66.82
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 TRAILERS)$32.81$34.51$67.32
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.61$34.51$67.12
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.11$34.51$66.62
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.06$34.51$66.57
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$32.01$34.51$66.52
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP$31.86$34.51$66.37

Residential RI20260002 rev 2

ClassificationRateFringeTotal
INSULATOR - PIPE & PIPEWRAPPER (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$49.91$36.63$86.54
ELECTRICIAN$42.09$17.92$60.01
ELEVATOR MECHANIC$64.52$38.44$102.96
POWER EQUIPMENT OPERATOR: PAVER A$40.82$28.25$69.07
POWER EQUIPMENT OPERATOR: GRADER AND ROLLER A$39.90$28.25$68.15
ROOFER$47.49$31.44$78.93
SPRINKLER FITTER$24.24$9.81$34.05
POWER EQUIPMENT OPERATOR (BACKHOE)$20.27$8.98$29.25
PLUMBER$23.96$8.95$32.91
PLASTERER$13.50$2.45$15.95
PAINTER (BRUSH AND ROLLER)$20.55$8.50$29.05
LABORER (UNSKILLED, LANDSCAPE, & BRICK MASON TENDER)$18.47$8.10$26.57
INSULATOR - BATT$19.56$9.65$29.21
FLOOR LAYER: CARPET$15.62$9.65$25.27
DRYWALL FINISHER/TAPER$20.55$8.50$29.05
CEMENT MASON/FINISHER$20.45$11.40$31.85
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, & METAL STUD FRAMING)$15.32$9.65$24.97
BRICKLAYER$20.45$11.40$31.85