RI20260001: rev 3 → rev 4

1 rate change, 15 added, 9 removed.

Rate changes

Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.

ClassificationOld totalNew totalΔ/hrHours on jobCost impact
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION)$73.85$65.75-8.10

Added classifications

LABORER (BUILDING CONSTRUCTION): GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems$37.00$26.90
LABORER (BUILDING CONSTRUCTION): GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator$37.00$26.90
LABORER (BUILDING CONSTRUCTION): GROUP 3: Pre-Cast Floor & Roof Plank Erectors$37.00$26.90
LABORER (BUILDING CONSTRUCTION): GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster$37.00$26.90
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP 3: Hazardous waste work within the "HOT" zone$42.45$24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 2: Change house attendant, powder watchperson $ 45.00 24.15 LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 3: Hazardous waste work within the "HOT" zone$42.45$24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 1: Laborer; Carpenter tender; Cement finisher tender; Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries$33.05$24.05
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator; Pipelayer; Pipe trench bracer$35.75$24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster$36.50$24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 4: Flagger & signaler$29.00$24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 5: Toxic waste remover$33.05$24.05
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST BORING: DRILLER$41.95$24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST BORING: LABORER$41.95$24.15
PAINTER (TAPER)$38.82$25.80
PAINTER (WALL COVERER)$38.57$25.80

Removed classifications

LABORER GROUP 4 (BUILDING CONSTRUCTION)was $37.00
LABORER GROUP 3 (BUILDING CONSTRUCTION)was $37.00
LABORER GROUP 2 (BUILDING CONSTRUCTION)was $37.00
LABORER GROUP 1 (BUILDING CONSTRUCTION)was $37.00
LABORER TEST BORING LABORERwas $41.95
LABORER TEST BORING DRILLERwas $41.95
LABORER FREE AIR GROUP 3was $42.45
LABORER FREE AIR GROUP 2was $45.00
LABORER COMPRESSED AIR GROUP 3was $42.45