Atoka County, Oklahoma: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building OK20260069 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $33.70 | $24.41 | $58.11 |
| ELECTRICIAN (CHOCKTAW COUNTY ONLY) | $26.60 | $11.92 | $38.52 |
| ELECTRICIAN: LOW VOLTAGE WIRING, ALARM INSTALLATION AND SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION ONLY (CHOCKTAW COUNTY ONLY) | $26.60 | $11.92 | $38.52 |
| ELECTRICIAN (ATOKA COUNTY ONLY) | $38.38 | $12.89 | $51.27 |
| ELECTRICIAN: LOW VOLTAGE WIRING, ALARM INSTALLATION AND SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION ONLY (ATOKA COUNTY ONLY) | $38.38 | $12.89 | $51.27 |
| ELECTRICIAN (BRYAN COUNTY) | $41.40 | $13.14 | $54.54 |
| ELECTRICIAN: LOW VOLTAGE WIRING, ALARM INSTALLATION AND SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION ONLY (BRYAN COUNTY) | $24.26 | $9.76 | $34.02 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 |
| IRONWORKER, STRUCTURAL | $30.35 | $16.83 | $47.18 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $41.00 | $16.03 | $57.03 |
| PIPEFITTER (INCLUDING INSTALLATION OF HVAC ELECTRICAL/TEMPERATURE CONTROLS AND HVAC PIPE INSTALLATION) | $41.00 | $16.03 | $57.03 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $35.49 | $14.60 | $50.09 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $21.52 | $6.00 | $27.52 |
| ROOFER | $15.00 | $0.29 | $15.29 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.32 | $0.00 | $12.32 |
| OPERATOR: FORKLIFT | $18.02 | $0.00 | $18.02 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.83 | $0.00 | $16.83 |
| LABORER: PIPELAYER | $11.65 | $0.00 | $11.65 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.04 | $0.00 | $13.04 |
| LABORER: MASON TENDER - BRICK | $12.00 | $0.00 | $12.00 |
| LABORER: COMMON OR GENERAL | $11.43 | $0.00 | $11.43 |
| GLAZIER | $15.27 | $1.46 | $16.73 |
| FORM WORKER | $16.79 | $3.12 | $19.91 |
| FLOOR LAYER (HARDWOOD AND CARPET) | $18.74 | $1.10 | $19.84 |
| CEMENT MASON/CONCRETE FINISHER | $14.50 | $0.00 | $14.50 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $16.82 | $2.82 | $19.64 |
| CARPENTER (DRYWALL HANGING ONLY) | $14.96 | $0.00 | $14.96 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $16.24 | $0.00 | $16.24 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Heavy OK20260035 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $14.00 | $0.00 | $14.00 |
| ELECTRICIAN | $51.00 | $23.80 | $74.80 |
| IRONWORKER, STRUCTURAL (CARTER, GARVIN, JOHNSTON, LOVE, MARSHALL, MURRAY, PONTOTOC, POTTAWATOMIE, AND SEMINOLE COUNTIES) | $32.10 | $17.38 | $49.48 |
| IRONWORKER, STRUCTURAL (ATOKA, BRYAN, CHOCTAW, COAL, HASKELL, HUGHES, LATIMER, MCCURTAIN, PITTSBURG, AND PUSHMATAHA COUNTIES) | $30.35 | $16.83 | $47.18 |
| OPERATOR: SCRAPER | $14.00 | $0.00 | $14.00 |
| LABORER: PIPELAYER | $14.00 | $0.00 | $14.00 |
| LABORER: COMMON OR GENERAL | $13.09 | $0.00 | $13.09 |
| TRUCK DRIVER ((3) FLATBED TRUCK) | $30.85 | $16.65 | $47.50 |
POWER EQUIPMENT OPERATOR 9 classifications · $46.30 to $57.14 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 9 PUMPS | $28.25 | $19.05 | $47.30 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT;TRACTOR | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ROTARY DRILLING MACHINE WHEN OPERATED FROM CONSOLE | $30.87 | $19.05 | $49.92 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BOBCAT/SKID STEER/SKID LOADER | $32.71 | $19.05 | $51.76 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE; MECHANIC; BACKHOE; TRACKHOE; GRADER/BLADE; POWER DRIVEN HOLE DIGGER WITH LESS THAN 30' MAST AND BULLDOZER | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 |
Highway OK20260020 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER (WATER TRUCK) | $12.00 | $0.00 | $12.00 |
| TRUCK DRIVER (STRAIGHT TRUCK) | $15.92 | $0.00 | $15.92 |
| TRUCK DRIVER (SINGLE AXLE TRUCK (INCLUDES PILOT CAR)) | $13.15 | $0.00 | $13.15 |
| TRUCK DRIVER (OFF THE ROAD TRUCK) | $12.63 | $0.00 | $12.63 |
| TRUCK DRIVER (LOWBOY/FLOAT) | $14.99 | $0.00 | $14.99 |
| TRUCK DRIVER (FLATBED TRUCK) | $16.18 | $0.00 | $16.18 |
| TRUCK DRIVER (DUMP TRUCK) | $14.42 | $0.00 | $14.42 |
| TRUCK DRIVER (CONCRETE TRUCK) | $14.22 | $0.00 | $14.22 |
| LABORER, COMMON OR GENERAL (SEMINOLE COUNTY) | $10.79 | $0.00 | $10.79 |
| LABORER, COMMON OR GENERAL (PUSHMATAHA COUNTY) | $10.80 | $0.00 | $10.80 |
| LABORER, COMMON OR GENERAL (POTTAWATOMIE COUNTY) | $10.60 | $0.00 | $10.60 |
| LABORER, COMMON OR GENERAL (PONTOTOC COUNTY) | $10.48 | $0.00 | $10.48 |
| LABORER, COMMON OR GENERAL (PITTSBURG COUNTY) | $11.05 | $0.00 | $11.05 |
| LABORER, COMMON OR GENERAL (MURRAY COUNTY) | $9.88 | $0.00 | $9.88 |
| LABORER, COMMON OR GENERAL (MCCURTAIN COUNTY) | $9.82 | $0.00 | $9.82 |
| LABORER, COMMON OR GENERAL (MARSHALL COUNTY) | $11.68 | $0.00 | $11.68 |
| LABORER, COMMON OR GENERAL (LOVE COUNTY) | $10.42 | $0.00 | $10.42 |
| LABORER, COMMON OR GENERAL (LATIMER COUNTY) | $10.25 | $0.00 | $10.25 |
| LABORER, COMMON OR GENERAL (JOHNSTON COUNTY) | $10.37 | $0.00 | $10.37 |
| LABORER, COMMON OR GENERAL (HUGHES COUNTY) | $10.01 | $0.00 | $10.01 |
| LABORER, COMMON OR GENERAL (GARVIN COUNTY) | $10.40 | $0.00 | $10.40 |
| LABORER, COMMON OR GENERAL (COAL COUNTY) | $10.55 | $0.00 | $10.55 |
| LABORER, COMMON OR GENERAL (CHOCTAW COUNTY) | $10.34 | $0.00 | $10.34 |
| LABORER, COMMON OR GENERAL (CARTER COUNTY) | $9.97 | $0.00 | $9.97 |
| LABORER, COMMON OR GENERAL (BRYAN AND HASKALL COUNTIES) | $10.49 | $0.00 | $10.49 |
| LABORER, COMMON OR GENERAL (ATOKA COUNTY) | $10.22 | $0.00 | $10.22 |
| LABORER (VIBRATING PLATE) | $12.70 | $0.00 | $12.70 |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS)) | $11.15 | $0.00 | $11.15 |
| LABORER (PIPELAYER) | $11.13 | $0.00 | $11.13 |
| LABORER (ASPHALT RAKER AND SHOVELER) | $12.35 | $0.00 | $12.35 |
| LABORER (AIR/POWER TOOL OPERATOR (INCLUDES HANDHELD CONCRETE SAWS AND CHIPPING GUNS)) | $12.79 | $0.00 | $12.79 |
| IRONWORKER: REINFORCING | $13.63 | $0.00 | $13.63 |
| GUARDRAIL INSTALLER (INCLUDES GUARDRAIL/POST DRIVER WORK) | $9.70 | $0.00 | $9.70 |
| FORM WORKER | $12.19 | $0.00 | $12.19 |
| CEMENT MASON/CONCRETE FINISHER (REMAINING COUNTIES) | $12.65 | $0.00 | $12.65 |
| CEMENT MASON/CONCRETE FINISHER (POTTAWATOMIE COUNTY) | $12.28 | $0.00 | $12.28 |
| CEMENT MASON/CONCRETE FINISHER (PITTSBURG COUNTY) | $13.70 | $0.00 | $13.70 |
| CEMENT MASON/CONCRETE FINISHER (LOVE COUNTY) | $12.95 | $0.00 | $12.95 |
| CEMENT MASON/CONCRETE FINISHER (CHOCTAW COUNTY) | $12.00 | $0.00 | $12.00 |
| CEMENT MASON/CONCRETE FINISHER (CARTER COUNTY) | $11.80 | $0.00 | $11.80 |
| CARPENTER, EXCLUDES FORM WORK (REMAINING COUNTIES) | $12.53 | $0.00 | $12.53 |
| CARPENTER, EXCLUDES FORM WORK (POTTAWATOMIE COUNTY) | $12.14 | $0.00 | $12.14 |
| CARPENTER, EXCLUDES FORM WORK (PITTSBURG COUNTY) | $12.49 | $0.00 | $12.49 |
| CARPENTER, EXCLUDES FORM WORK (LOVE COUNTY) | $12.45 | $0.00 | $12.45 |
| CARPENTER, EXCLUDES FORM WORK (HUGHES COUNTY) | $11.75 | $0.00 | $11.75 |
| CARPENTER, EXCLUDES FORM WORK (CHOCTAW COUNTY) | $12.87 | $0.00 | $12.87 |
TRUCK DRIVER 6 classifications · $14.06 to $16.61 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (SEMINOLE COUNTY) | $16.12 | $0.00 | $16.12 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (REMAINING COUNTIES) | $14.76 | $0.00 | $14.76 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (PITTSBURG COUNTY) | $15.68 | $0.00 | $15.68 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (LOVE COUNTY) | $14.06 | $0.00 | $14.06 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (CHOCTAW COUNTY) | $14.43 | $0.00 | $14.43 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (CARTER COUNTY) | $16.61 | $0.00 | $16.61 |
POWER EQUIPMENT OPERATOR 35 classifications · $11.02 to $17.37 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (SEMINOLE COUNTY) | $13.39 | $0.00 | $13.39 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (REMAINING COUNTIES) | $13.10 | $0.00 | $13.10 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW (REMAINING COUNTIES) | $15.02 | $0.00 | $15.02 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW (PITTSBURG COUNTY) | $16.42 | $0.00 | $16.42 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (REMAINING COUNTIES) | $14.34 | $0.00 | $14.34 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (PITTSBURG) | $14.89 | $0.00 | $14.89 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (MCCURTAIN COUNTY) | $13.02 | $0.00 | $13.02 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (LOVE COUNTY) | $14.35 | $0.00 | $14.35 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (CHOCTAW COUNTY) | $14.56 | $0.00 | $14.56 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES) | $14.05 | $0.00 | $14.05 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (PITTSBURG COUNTY) | $16.83 | $0.00 | $16.83 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (MCCURTAIN COUNTY) | $12.52 | $0.00 | $12.52 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (CHOCTAW COUNTY) | $13.46 | $0.00 | $13.46 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $14.66 | $0.00 | $14.66 |
| POWER EQUIPMENT OPERATOR: (TRANSFER MATERIAL MACHINE) | $12.38 | $0.75 | $13.13 |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) | $12.46 | $0.00 | $12.46 |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) | $12.13 | $0.00 | $12.13 |
| POWER EQUIPMENT OPERATOR: (SCRAPER) | $14.62 | $0.00 | $14.62 |
| POWER EQUIPMENT OPERATOR: (ROTOMILL) | $17.33 | $0.00 | $17.33 |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) | $11.86 | $0.00 | $11.86 |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT)) | $12.61 | $0.00 | $12.61 |
| POWER EQUIPMENT OPERATOR: (OILER) | $16.06 | $0.00 | $16.06 |
| POWER EQUIPMENT OPERATOR: (MIXER) | $14.56 | $0.00 | $14.56 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $14.16 | $0.00 | $14.16 |
| POWER EQUIPMENT OPERATOR: (MECHANIC) | $17.37 | $0.00 | $17.37 |
| POWER EQUIPMENT OPERATOR: (GRADER/BLADE) | $17.04 | $0.00 | $17.04 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | $14.08 | $0.00 | $14.08 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) | $13.25 | $0.00 | $13.25 |
| POWER EQUIPMENT OPERATOR: (CRANE) | $16.17 | $0.00 | $16.17 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE) | $14.42 | $0.00 | $14.42 |
| POWER EQUIPMENT OPERATOR: (BROOM) | $11.02 | $0.00 | $11.02 |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) | $12.62 | $0.00 | $12.62 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PLANT) | $14.70 | $0.00 | $14.70 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | $13.11 | $0.00 | $13.11 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) | $13.99 | $0.00 | $13.99 |
Residential OK20260002 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $7.25 | $0.00 | $7.25 |
| TILE SETTER | $8.00 | $0.00 | $8.00 |
| SHEET METAL WORKER | $7.25 | $0.00 | $7.25 |
| ROOFER | $7.25 | $0.00 | $7.25 |
| PLUMBER/PIPEFITTER | $7.81 | $0.00 | $7.81 |
| PAINTER | $8.00 | $0.00 | $8.00 |
| LABORER | $7.25 | $0.00 | $7.25 |
| IRONWORKER | $7.25 | $0.00 | $7.25 |
| INSULATION INSTALLER | $7.25 | $0.00 | $7.25 |
| FLOOR LAYER: CARPET | $8.00 | $0.00 | $8.00 |
| ELEVATOR MECHANIC | $13.74 | $0.00 | $13.74 |
| ELECTRICIAN | $8.00 | $0.00 | $8.00 |
| DRYWALL INSTALLER | $10.00 | $0.00 | $10.00 |
| CEMENT MASON/CONCRETE FINISHER | $7.29 | $0.00 | $7.29 |
| CARPENTER | $7.57 | $0.00 | $7.57 |
| BRICKLAYER | $10.00 | $0.00 | $10.00 |
| AIR CONDITIONING MECHANIC | $8.00 | $0.00 | $8.00 |
POWER EQUIPMENT OPERATORS 9 classifications · $7.25 to $9.50 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: TRACTOR | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATORS: SCRAPER | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATORS: MOTOR GRADER | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATORS: (TRENCHING MACHINE) | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATORS: (ROLLER) | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATORS: (CRANE OPERATOR) | $9.50 | $0.00 | $9.50 |
| POWER EQUIPMENT OPERATORS: (BULLDOZER OPERATOR) | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATORS: (BOX BLADE OPERATOR) | $7.25 | $0.00 | $7.25 |
| POWER EQUIPMENT OPERATORS: (BACKHOE OPERATOR) | $7.25 | $0.00 | $7.25 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.