Summers County, West Virginia: Davis-Bacon prevailing wages

Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.

Building WV20260026 rev 1

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$38.05$30.87$68.92
BOILERMAKER$47.13$28.93$76.06
BRICK POINTER/CAULKER/CLEANER$31.65$25.56$57.21
MASON - STONE$33.00$26.18$59.18
CARPENTER (SCAFFOLD BUILDER ONLY)$30.00$21.15$51.15
CARPENTER (INCLUDING FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL)$30.03$23.65$53.68
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER$34.71$22.05$56.76
POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES$45.21$22.05$67.26
POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER$46.21$22.05$68.26
POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE$46.56$22.05$68.61
IRONWORKER: ORNAMENTAL$35.19$25.66$60.85
IRONWORKER: REINFORCING$36.10$24.65$60.75
PAINTER: DRYWALL FINISHING/TAPING$30.57$20.06$50.63
TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS$27.21$8.97$36.18
ROOFER$24.28$9.32$33.60
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION$27.64$18.09$45.73
PAINTER: BRUSH, ROLLER AND SPRAY$28.55$3.00$31.55
OPERATOR: FORKLIFT$33.09$3.00$36.09
OPERATOR: EXCAVATOR$37.69$3.00$40.69
OPERATOR: BULLDOZER$30.24$10.26$40.50
IRONWORKER, STRUCTURAL$26.01$12.18$38.19
ELECTRICIAN$28.16$15.11$43.27
CARPENTER (DRYWALL HANGING ONLY)$25.08$12.58$37.66
BRICKLAYER$27.50$12.35$39.85
LABORER 6 classifications · $28.27 to $42.16 total
ClassificationRateFringeTotal
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND)$22.76$16.75$39.51
LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY$25.41$16.75$42.16
LABORER: MASON TENDER - CEMENT/CONCRETE$22.05$8.54$30.59
LABORER: MASON TENDER - BRICK$21.47$8.29$29.76
LABORER: DEMOLITION$20.58$9.47$30.05
LABORER: COMMON OR GENERAL$25.27$3.00$28.27

Heavy WV20260061 rev 1

ClassificationRateFringeTotal
MILLWRIGHT$39.60$26.06$65.66
ELECTRICIAN$42.20$20.39$62.59
IRONWORKER: ORNAMENTAL$35.50$29.11$64.61
IRONWORKER: REINFORCING AND STRUCTURAL$34.84$25.40$60.24
LABORER: (PIPELINE) CHAIN SAW, COMMON, FLAGGER, LANDSCAPE, PIPELAYER, SANDBLASTER$25.26$16.50$41.76
LABORER: GROUP 3 CARPENTER TENDER, COMMON OR GENERAL, FLAGGER, LANDSCAPE$25.26$16.50$41.76
LABORER: GROUP 2 AIR TOOL OPERATOR, CHAIN SAW, COMPACTOR (DIRT) HAND HELD, CONCRETE WORKER, HAND HELD DRILL, FORM WORK ONLY, GRADE CHECKER, GROUTING, PIPELAYER, SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WACKER ROLLER OPERATOR$26.32$16.50$42.82
LABORER: GROUP 1 TUNNEL DRILLER, TUNNEL MINER$27.35$16.50$43.85
CEMENT MASON/CONCRETE FINISHER$35.77$27.54$63.31
LABORER: MASON TENDER - CEMENT/CONCRETE$26.17$16.50$42.67
POWER EQUIPMENT OPERATOR 8 classifications · $55.07 to $62.40 total
ClassificationRateFringeTotal
POWER EQUIPMENT OPERATOR: GROUP 4 OILER$34.62$20.45$55.07
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER$38.08$20.45$58.53
POWER EQUIPMENT OPERATOR: GROUP 2 LOADERS UP TO SIX (6) CUBIC YARD CAPACITY, BACKHOE, BULLDOZERS, BOBCAT/SKID STEER/SKID LOADER, FORKLIFT, DRILL, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF UP TO ONE HUNDRED TEN THOUSAND (110,000) POUNDS$39.19$20.45$59.64
POWER EQUIPMENT OPERATOR: GROUP 1 CRANES (ALL TYPES), BOOM TRUCKS, LOADERS OF SIX (6) CUBIC YARD CAPACITY AND OVER, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF ONE HUNDRED TEN THOUSAND (110,000) POUNDS AND OVER$41.95$20.45$62.40
POWER EQUIPMENT OPERATOR: PIPELINE: GROUP 2 OILER$39.19$20.45$59.64
POWER EQUIPMENT OPERATOR: PIPELINE: GROUP 1 BOOM, BULLDOZER, EXCAVATOR, MECHANIC, PIPE BENDING MACHINE$41.95$20.45$62.40
POWER EQUIPMENT OPERATOR: SINGLE AND DOUBLE AXLE DUMP TRUCKS$41.95$20.45$62.40
POWER EQUIPMENT OPERATOR: MECHANIC$36.57$19.18$55.75

Highway WV20260093 rev 1

ClassificationRateFringeTotal
IRONWORKER$36.10$24.25$60.35
TRAFFIC CONTROL: MAINTENANCE PERSON$27.91$17.40$45.31
CEMENT MASON/CONCRETE FINISHER$35.77$27.54$63.31
TRUCK DRIVER: DUMP TRUCK$27.76$16.15$43.91
TRAFFIC CONTROL: FLAGGER$24.86$16.30$41.16
CARPENTER$27.72$19.81$47.53
OPERATOR 15 classifications · $46.25 to $60.65 total
ClassificationRateFringeTotal
OPERATOR: LOADER (SIX (6) CUBIC YARDS CAPACITY AND OVER)$40.35$20.30$60.65
OPERATOR: CRANE$40.35$20.30$60.65
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$37.59$20.30$57.89
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$37.59$20.30$57.89
OPERATOR: BROOM/SWEEPER$37.59$20.30$57.89
OPERATOR: BULLDOZER$37.59$20.30$57.89
OPERATOR: DRILL$37.59$20.30$57.89
OPERATOR: FORKLIFT$37.59$20.30$57.89
OPERATOR: GRADER/BLADE$37.59$20.30$57.89
OPERATOR: MILLING MACHINE$37.59$20.30$57.89
OPERATOR: POST DRIVER (GUARDRAIL/FENCES)$37.59$20.30$57.89
OPERATOR: ROLLER$36.48$20.30$56.78
OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT(ASPHALT, AGGREGATE, & CONCRETE)$32.12$18.93$51.05
OPERATOR: CONCRETE SCREED$27.61$18.64$46.25
OPERATOR: MECHANIC$34.20$19.75$53.95
LABORER 6 classifications · $46.40 to $47.43 total
ClassificationRateFringeTotal
LABORER: COMMON OR GENERAL$29.00$17.40$46.40
LABORER: GRADE CHECKER$29.00$17.40$46.40
LABORER: MASON TENDER - CEMENT/CONCRETE$29.00$17.40$46.40
LABORER: LASER SCREED OPERATOR$30.03$17.40$47.43
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$29.00$17.40$46.40
LABORER: GUARDRAIL INSTALLATION$29.00$17.40$46.40

Residential WV20260002 rev 1

ClassificationRateFringeTotal
SHEET METAL MECHANIC (INCLUDING DUCT WORK)$10.00$0.53$10.53
ROOFER$9.40$0.00$9.40
PLUMBER (EXCLUDING HVAC PIPE WORK)$11.50$0.00$11.50
PAINTERS: (BRUSH, ROLLER, SPRAY, INCLUDING DRYWALL FINISHING)$10.38$0.00$10.38
LABORERS: UNSKILLED$7.25$0.00$7.25
LABORERS: LANDSCAPE$7.58$0.00$7.58
ELECTRICIAN$10.41$0.00$10.41
CEMENT MASON/CONCRETE FINISHER$9.40$0.00$9.40
CARPENTER, INCLUDING DRYWALL HANGING$10.31$0.00$10.31
BRICKLAYER$12.00$0.00$12.00