Cabell County, West Virginia: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building WV20260035 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 |
| BOILERMAKER | $47.13 | $28.93 | $76.06 |
| BRICKLAYER | $31.16 | $27.26 | $58.42 |
| BRICK POINTER/CAULKER/CLEANER | $31.16 | $27.26 | $58.42 |
| MASON - STONE | $31.16 | $27.26 | $58.42 |
| TILE SETTER | $31.16 | $27.26 | $58.42 |
| TILE FINISHER | $27.00 | $22.57 | $49.57 |
| CARPENTER (INCLUDING DRYWALL HANGING, FORM WORK AND FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL) | $33.80 | $27.34 | $61.14 |
| ELECTRICIAN | $32.75 | $15.00 | $47.75 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER, ROLLER | $34.71 | $22.05 | $56.76 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 | $67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE, MECHANICS WITH TOOLS WITH 3/4 INCH DRIVE AND BELOW | $46.56 | $22.05 | $68.61 |
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 | $60.85 |
| IRONWORKER, REINFORCING AND STRUCTURAL: ZONE 2: 10-50 MILES FROM UNION HALL | $39.70 | $29.59 | $69.29 |
| IRONWORKER, REINFORCING AND STRUCTURAL: ZONE 1: 0-10 MILES FROM UNION HALL | $39.70 | $29.59 | $69.29 |
| IRONWORKER, REINFORCING AND STRUCTURAL: ZONE 3: 50 MILES & OVER FROM UNION HALL | $39.70 | $29.59 | $69.29 |
| LABORER: CARPENTER TENDER, COMMON OR GENERAL, CONCRETE SAW (HAND HELD/WALK BEHIND), CONCRETE WORKER, DEMOLITION, GRADE CHECKER, JACK HAMMER, LANDSCAPE, MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, MOTORIZED BUGGY OPERATOR, PIPELAYER, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WATER BOY, WACKER ROLLER OPERATOR | $25.41 | $16.75 | $42.16 |
| PAINTER (DRYWALL FINISHING/TAPING; BRUSH, ROLLER AND SPRAY) | $30.85 | $17.80 | $48.65 |
| GLAZIER | $32.89 | $13.38 | $46.27 |
| PLASTERER | $31.52 | $22.34 | $53.86 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 |
| PIPEFITTER | $38.04 | $39.72 | $77.76 |
| PLUMBER | $41.00 | $37.63 | $78.63 |
| ROOFER | $29.75 | $16.71 | $46.46 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $33.53 | $26.71 | $60.24 |
| TRUCK DRIVER: GROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) | $29.96 | $22.50 | $52.46 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) | $29.81 | $22.50 | $52.31 |
| LABORER: POWER TOOL OPERATOR | $23.10 | $16.75 | $39.85 |
Heavy WV20260066 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 2 LOADERS UP TO SIX (6) CUBIC YARD CAPACITY, BACKHOE, BULLDOZERS, COMPACTOR, FORKLIFT, GRADER/BLADE, MECHANIC, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF UP TO ONE HUNDRED TEN THOUSAND (110,000) POUNDS, TRACTOR, TRENCHER | $39.19 | $20.45 | $59.64 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANES (ALL TYPES), LOADERS OF SIX (6) CUBIC YARD CAPACITY AND OVER, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF ONE HUNDRED TEN THOUSAND (110,000) POUNDS AND OVER | $41.95 | $20.45 | $62.40 |
| IRONWORKER: ORNAMENTAL | $35.50 | $29.11 | $64.61 |
| IRONWORKER, REINFORCING | $36.10 | $24.65 | $60.75 |
| PAINTER: SPRAY | $34.49 | $17.53 | $52.02 |
| CEMENT MASON/CONCRETE FINISHER | $35.77 | $27.54 | $63.31 |
| TRUCK DRIVER, DUMP (EXCLUDING OFF THE ROAD TRUCKS) | $22.46 | $13.49 | $35.95 |
| OPERATOR: ROLLER | $23.49 | $14.88 | $38.37 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.39 | $15.50 | $39.89 |
| OPERATOR: OILER | $21.44 | $14.42 | $35.86 |
| OPERATOR: BOOM | $28.71 | $11.59 | $40.30 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.80 | $14.79 | $39.59 |
| IRONWORKER, STRUCTURAL | $30.70 | $11.64 | $42.34 |
| ELECTRICIAN | $26.38 | $17.06 | $43.44 |
| CARPENTER, INCLUDES FORM WORK | $25.40 | $11.34 | $36.74 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $31.77 | $15.98 | $47.75 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $31.77 | $15.98 | $47.75 |
| TRUCK DRIVER: FLATBED TRUCK | $30.98 | $15.98 | $46.96 |
| LABORER (MORTAR MIXER) | $26.17 | $16.50 | $42.67 |
| POWER EQUIPMENT OPERATOR: DRILL | $35.19 | $19.18 | $54.37 |
LABORER 11 classifications · $33.66 to $42.82 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GROUP 2 FLAGGER | $25.26 | $16.50 | $41.76 |
| LABORER: GROUP 1 ASPHALT RAKER, BULL FLOAT MAN, CHAIN SAW, HAND HELD DRILL, WACKER ROLLER OPERATOR | $26.32 | $16.50 | $42.82 |
| LABORER: TAMPER (HAND HELD) | $25.41 | $16.50 | $41.91 |
| LABORER: GRADE CHECKER | $25.41 | $16.50 | $41.91 |
| LABORER: CONCRETE WORKER | $25.41 | $16.50 | $41.91 |
| LABORER: COMMON OR GENERAL | $25.41 | $16.50 | $41.91 |
| LABORER: PIPELAYER HELPER | $24.52 | $9.42 | $33.94 |
| LABORER: PIPELAYER | $24.59 | $9.42 | $34.01 |
| LABORER: LANDSCAPE | $24.66 | $9.11 | $33.77 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $24.34 | $9.32 | $33.66 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.17 | $16.50 | $42.67 |
Highway WV20260100 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $33.80 | $27.34 | $61.14 |
| TRAFFIC SIGNALIZATION: GROUNDSMAN | $22.12 | $26.26 | $48.38 |
| IRONWORKER | $34.84 | $25.16 | $60.00 |
| TRAFFIC CONTROL PERSON | $27.91 | $17.40 | $45.31 |
| CEMENT MASON/CONCRETE FINISHER | $35.77 | $27.54 | $63.31 |
| TRUCK DRIVER: DUMP TRUCK | $29.04 | $16.15 | $45.19 |
OPERATOR 14 classifications · $51.45 to $60.65 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: CRANE | $40.35 | $20.30 | $60.65 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $37.59 | $20.30 | $57.89 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $37.59 | $20.30 | $57.89 |
| OPERATOR: BROOM/SWEEPER | $37.59 | $20.30 | $57.89 |
| OPERATOR: BULLDOZER | $37.59 | $20.30 | $57.89 |
| OPERATOR: DRILL | $37.59 | $20.30 | $57.89 |
| OPERATOR: FORKLIFT | $37.59 | $20.30 | $57.89 |
| OPERATOR: GRADER/BLADE | $37.59 | $20.30 | $57.89 |
| OPERATOR: MILLING MACHINE | $37.59 | $20.30 | $57.89 |
| OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT(ASPHALT, AGGREGATE, & CONCRETE) | $37.59 | $20.30 | $57.89 |
| OPERATOR: LOADER (UP TO SIX (6) CUBIC YARD CAPACITY) | $37.59 | $20.30 | $57.89 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | $37.59 | $20.30 | $57.89 |
| OPERATOR: ROLLER | $36.48 | $20.30 | $56.78 |
| OPERATOR: MECHANIC | $32.86 | $18.59 | $51.45 |
LABORER 7 classifications · $42.94 to $47.43 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GRADE CHECKER | $29.00 | $17.40 | $46.40 |
| LABORER: LASER SCREED OPERATOR | $30.03 | $17.40 | $47.43 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.00 | $17.40 | $46.40 |
| LABORER: GUARDRAIL INSTALLATION | $29.00 | $17.40 | $46.40 |
| LABORER: PIPELAYER | $29.00 | $17.40 | $46.40 |
| LABORER: COMMON OR GENERAL | $29.00 | $17.40 | $46.40 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.64 | $16.30 | $42.94 |
Residential WV20260001 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $15.27 | $3.20 | $18.47 |
| PAINTER | $8.21 | $0.00 | $8.21 |
| LABORER | $7.35 | $0.00 | $7.35 |
| ELECTRICIAN | $10.60 | $1.54 | $12.14 |
| DRYWALL HANGER | $12.86 | $0.00 | $12.86 |
| CARPENTER (EXCLUDING DRYWALL HANGING) | $8.36 | $0.00 | $8.36 |
| BRICKLAYER | $9.29 | $0.00 | $9.29 |