Highway construction wages: Tucker + 7 more counties, West Virginia
Wage determination WV20260097 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WV20260097 on · latest revision 1 · verify at sam.gov/wage-determination/WV20260097/1
TuckerGilmerLewisMasonTaylorTylerDoddridgePleasants
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: CRANE | $40.35 | $20.30 | $60.65 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $37.59 | $20.30 | $57.89 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $37.59 | $20.30 | $57.89 |
| OPERATOR: BROOM/SWEEPER | $37.59 | $20.30 | $57.89 |
| OPERATOR: BULLDOZER | $37.59 | $20.30 | $57.89 |
| OPERATOR: DRILL | $37.59 | $20.30 | $57.89 |
| OPERATOR: FORKLIFT | $37.59 | $20.30 | $57.89 |
| OPERATOR: GRADER/BLADE | $37.59 | $20.30 | $57.89 |
| OPERATOR: MILLING MACHINE | $37.59 | $20.30 | $57.89 |
| OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT(ASPHALT, AGGREGATE, & CONCRETE) | $37.59 | $20.30 | $57.89 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | $37.59 | $20.30 | $57.89 |
| OPERATOR: ROLLER | $36.48 | $20.30 | $56.78 |
| LABORER: COMMON OR GENERAL | $29.00 | $17.40 | $46.40 |
| TRAFFIC CONTROL PERSON | $27.91 | $17.40 | $45.31 |
| LABORER: GRADE CHECKER | $29.00 | $17.40 | $46.40 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.00 | $17.40 | $46.40 |
| LABORER: LASER SCREED OPERATOR | $30.03 | $17.40 | $47.43 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.00 | $17.40 | $46.40 |
| LABORER: GUARDRAIL INSTALLATION | $29.00 | $17.40 | $46.40 |
| LABORER: SIGN AND DISPLAY ERECTOR | $29.00 | $17.40 | $46.40 |
| CEMENT MASON/CONCRETE FINISHER | $35.77 | $27.54 | $63.31 |
| TRUCK DRIVER: DUMP TRUCK | $28.58 | $18.60 | $47.18 |
| OPERATOR: CONCRETE SCREED | $31.35 | $17.96 | $49.31 |
| OPERATOR: MECHANIC | $35.04 | $20.10 | $55.14 |
| OPERATOR: LOADER | $34.70 | $18.98 | $53.68 |
| IRONWORKER | $34.20 | $22.71 | $56.91 |
| CARPENTER | $29.39 | $20.49 | $49.88 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.