Heavy construction wages: Tyler, Doddridge, West Virginia
Wage determination WV20260062 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WV20260062 on · latest revision 1 · verify at sam.gov/wage-determination/WV20260062/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $42.20 | $20.39 | $62.59 |
| POWER EQUIPMENT OPERATOR: GROUP 4 OILER | $34.62 | $20.45 | $55.07 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER | $38.08 | $20.45 | $58.53 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LOADERS UP TO SIX (6) CUBIC YARD CAPACITY, BULLDOZERS, BOBCAT/SKID STEER/SKID LOADER, FORKLIFT, DRILL | $39.19 | $20.45 | $59.64 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANES (ALL TYPES), BOOM TRUCKS, LOADERS OF SIX (6) CUBIC YARD CAPACITY AND OVER | $41.95 | $20.45 | $62.40 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $35.50 | $29.11 | $64.61 |
| LABORER: GROUP 2 FLAGGER | $25.26 | $16.80 | $42.06 |
| LABORER: GROUP 1 CHAIN SAW, CONCRETE WORKER, HAND HELD DRILL, FORM WORK, GRADE CHECKER, SIGNAL MAN | $28.02 | $16.80 | $44.82 |
| CEMENT MASON/CONCRETE FINISHER | $35.77 | $27.54 | $63.31 |
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $23.44 | $12.52 | $35.96 |
| OPERATOR: EXCAVATOR | $24.39 | $15.50 | $39.89 |
| OPERATOR: BACKHOE | $24.39 | $15.50 | $39.89 |
| LABORER: PIPELAYER | $20.42 | $7.80 | $28.22 |
| LABORER: COMMON OR GENERAL | $22.59 | $10.14 | $32.73 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.17 | $16.50 | $42.67 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $36.57 | $19.18 | $55.75 |