Heavy construction wages: Taylor, West Virginia
Wage determination WV20260059 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WV20260059 on · latest revision 1 · verify at sam.gov/wage-determination/WV20260059/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $42.20 | $20.39 | $62.59 |
| POWER EQUIPMENT OPERATOR: GROUP 4 OILER | $34.62 | $20.45 | $55.07 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER | $38.08 | $20.45 | $58.53 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LOADERS UP TO SIX (6) CUBIC YARD CAPACITY, BULLDOZERS, BOBCAT/SKID STEER/SKID LOADER, FORKLIFT, DRILL | $39.19 | $20.45 | $59.64 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANES (ALL TYPES), BOOM TRUCKS, LOADERS OF SIX (6) CUBIC YARD CAPACITY AND OVER | $41.95 | $20.45 | $62.40 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $35.50 | $29.11 | $64.61 |
| LABORER: GROUP 2 COMMON OR GENERAL, FLAGGER | $25.26 | $16.50 | $41.76 |
| LABORER: GROUP 1 CHAIN SAW, CONCRETE WORKER, HAND HELD DRILL, FORM WORK ONLY, GRADE CHECKER, SIGNAL MAN | $26.32 | $16.50 | $42.82 |
| CEMENT MASON/CONCRETE FINISHER | $35.77 | $27.54 | $63.31 |
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $23.44 | $12.52 | $35.96 |
| OPERATOR: EXCAVATOR | $24.39 | $15.50 | $39.89 |
| OPERATOR: BACKHOE | $24.39 | $15.50 | $39.89 |
| LABORER: PIPELAYER | $20.42 | $7.80 | $28.22 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.17 | $16.50 | $42.67 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $36.57 | $19.18 | $55.75 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.