Building construction wages: Mineral, West Virginia
Wage determination WV20260041 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WV20260041 on · latest revision 1 · verify at sam.gov/wage-determination/WV20260041/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 |
| BOILERMAKER | $47.13 | $28.93 | $76.06 |
| TILE SETTER | $31.65 | $25.56 | $57.21 |
| BRICKLAYER | $31.53 | $25.47 | $57.00 |
| MASON - STONE | $28.90 | $23.91 | $52.81 |
| TILE FINISHER | $27.00 | $22.57 | $49.57 |
| CARPENTER (INCLUDING DRYWALL FINISHING/TAPING, DRYWALL HANGING AND FORM WORK) | $29.40 | $20.25 | $49.65 |
| MILLWRIGHT | $37.40 | $26.06 | $63.46 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $42.20 | $20.39 | $62.59 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATIONS: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $59.02 | $38.44 | $97.46 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER | $34.71 | $22.05 | $56.76 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 | $67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE, MECHANICS WITH TOOLS WITH 3/4 INCH DRIVE AND BELOW | $46.56 | $22.05 | $68.61 |
| IRONWORKER: ORNAMENTAL AND REINFORCING | $35.19 | $25.66 | $60.85 |
| IRONWORKER (SHEETING AND STRUCTURAL) | $31.65 | $24.50 | $56.15 |
| LABORER: GROUP 3 PIPELAYER | $24.94 | $16.20 | $41.14 |
| LABORER: GROUP 2 CONCRETE SAW (HAND HELD/WALK BEHIND), MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR | $24.94 | $16.20 | $41.14 |
| LABORER: GROUP 1 CARPENTER TENDER, DEMOLITION | $24.94 | $16.20 | $41.14 |
| PLUMBER | $34.05 | $41.05 | $75.10 |
| ROOFER | $29.75 | $16.71 | $46.46 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (66+ MILES FROM CITY HALL, CUMBERLAND, MARYLAND) | $30.73 | $24.03 | $54.76 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (41-65 MILES FROM CITY HALL, CUMBERLAND, MARYLAND) | $30.23 | $24.03 | $54.26 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (0-40 MILES FROM CITY HALL, CUMBERLAND, MARYLAND) | $27.73 | $24.03 | $51.76 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $30.96 | $15.81 | $46.77 |
| PIPEFITTER | $25.76 | $19.46 | $45.22 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $22.33 | $9.95 | $32.28 |
| OPERATOR: EXCAVATOR | $23.27 | $11.95 | $35.22 |
| OPERATOR: BACKHOE | $21.51 | $7.36 | $28.87 |
| LABORER: COMMON OR GENERAL | $18.80 | $5.99 | $24.79 |
| GLAZIER | $23.20 | $4.02 | $27.22 |
| TRUCK DRIVER: GROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) | $29.96 | $22.50 | $52.46 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) | $29.81 | $22.50 | $52.31 |
| LABORER: POWER TOOL OPERATOR | $22.81 | $16.50 | $39.31 |