Building construction wages: Lewis, West Virginia
Wage determination WV20260013 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WV20260013 on · latest revision 1 · verify at sam.gov/wage-determination/WV20260013/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 | $68.92 |
| BOILERMAKER | $47.13 | $28.93 | $76.06 |
| BRICK POINTER/CAULKER/CLEANER | $31.65 | $25.56 | $57.21 |
| MASON - STONE | $33.00 | $26.18 | $59.18 |
| CARPENTER (INCLUDING DRYWALL HANGING, SCAFFOLD BUILDER; FLOOR LAYING-CARPET,HARDWOOD, RESILIENT AND VINYL) | $33.05 | $26.50 | $59.55 |
| MILLWRIGHT | $37.40 | $26.06 | $63.46 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER | $34.71 | $22.05 | $56.76 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES | $45.21 | $22.05 | $67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE | $46.56 | $22.05 | $68.61 |
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 | $60.85 |
| IRONWORKER: REINFORCING | $36.10 | $24.65 | $60.75 |
| LABORER (WACKER ROLLER OPERATOR) | $28.02 | $16.80 | $44.82 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $22.76 | $16.75 | $39.51 |
| LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY | $25.41 | $16.75 | $42.16 |
| LABORER: GROUP 2 AIRTOOL OPERATOR, BOBCAT OPERATOR (CLEAN UP/DEMOLITION), DEWATERING, RODMAN, SKYTRAK FORKLIFT OPERATOR | $24.13 | $16.05 | $40.18 |
| LABORER: GROUP 1 COMMON OR GENERAL | $24.13 | $16.05 | $40.18 |
| PAINTER: DRYWALL FINISHING/TAPING | $30.57 | $20.06 | $50.63 |
| GLAZIER | $32.89 | $13.38 | $46.27 |
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 | $57.33 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 | $61.43 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 |
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 | $57.33 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 | $61.43 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 |
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $28.52 | $3.00 | $31.52 |
| ROOFER | $24.28 | $9.32 | $33.60 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $27.64 | $18.09 | $45.73 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $22.03 | $9.95 | $31.98 |
| OPERATOR: FORKLIFT | $33.09 | $3.00 | $36.09 |
| OPERATOR: EXCAVATOR | $30.31 | $10.81 | $41.12 |
| OPERATOR: BULLDOZER | $30.24 | $10.26 | $40.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.05 | $8.54 | $30.59 |
| LABORER: MASON TENDER - BRICK | $21.47 | $8.29 | $29.76 |
| LABORER: DEMOLITION | $20.58 | $9.47 | $30.05 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $23.85 | $10.95 | $34.80 |
| IRONWORKER, STRUCTURAL | $26.27 | $15.85 | $42.12 |
| ELECTRICIAN | $28.16 | $15.11 | $43.27 |
| BRICKLAYER | $27.50 | $12.35 | $39.85 |
| CARPENTER (FORM WORK ONLY) | $29.81 | $23.45 | $53.26 |
| LABORER (TAMPER - HAND HELD) | $25.79 | $16.19 | $41.98 |
| LABORER (SCAFFOLD BUILDER) | $24.04 | $16.35 | $40.39 |
| LABORER (PIPELAYER) | $24.34 | $16.41 | $40.75 |
| LABORER (MORTAR MIXER) | $24.35 | $16.20 | $40.55 |
| LABORER (LANDSCAPE) | $23.63 | $16.43 | $40.06 |
| LABORER (GRADE CHECKER) | $24.24 | $16.27 | $40.51 |
| LABORER (CONCRETE WORKER) | $24.29 | $16.27 | $40.56 |
| LABORER (CHIPPING GUN) | $24.78 | $16.25 | $41.03 |
| LABORER (CARPENTER TENDER) | $24.19 | $16.23 | $40.42 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $30.10 | $22.51 | $52.61 |
| PLUMBER | $36.58 | $24.58 | $61.16 |