Building construction wages: Hardy, West Virginia
Wage determination WV20260010 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WV20260010 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/WV20260010/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 | $60.94 |
| FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $30.21 | $10.43 | $40.64 |
| BOILERMAKER | $47.13 | $28.93 | $76.06 |
| BRICK POINTER/CAULKER/CLEANER | $31.65 | $25.56 | $57.21 |
| MASON - STONE | $33.00 | $26.18 | $59.18 |
| CARPENTER (INCLUDING DRYWALL HANGING AND SCAFFOLD BUILDER) | $29.40 | $20.25 | $49.65 |
| MILLWRIGHT | $37.40 | $26.06 | $63.46 |
| CARPENTER (FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL ONLY) | $30.00 | $21.15 | $51.15 |
| ELECTRICIAN | $42.20 | $20.39 | $62.59 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER | $34.71 | $22.05 | $56.76 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES | $45.21 | $22.05 | $67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE | $46.56 | $22.05 | $68.61 |
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 | $60.85 |
| IRONWORKER: REINFORCING | $36.10 | $24.65 | $60.75 |
| LABORER (WACKER ROLLER OPERATOR) | $28.02 | $16.80 | $44.82 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $22.76 | $16.75 | $39.51 |
| LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY | $25.41 | $16.75 | $42.16 |
| LABORER: GROUP 2 AIRTOOL OPERATOR, ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILING), BOBCAT OPERATOR (CLEAN UP/DEMOLITION), DEWATERING, RODMAN, SKYTRAK FORKLIFT OPERATOR | $24.13 | $16.05 | $40.18 |
| LABORER GROUP 1 COMMON OR GENERAL | $24.13 | $16.05 | $40.18 |
| PAINTER: DRYWALL FINISHING/TAPING | $30.57 | $20.06 | $50.63 |
| GLAZIER | $32.89 | $13.38 | $46.27 |
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 | $57.33 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 | $61.43 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 |
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 | $57.33 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 | $61.43 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 |
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $28.52 | $3.00 | $31.52 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $25.61 | $15.68 | $41.29 |
| ROOFER | $24.28 | $9.32 | $33.60 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $27.64 | $18.09 | $45.73 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $22.03 | $9.95 | $31.98 |
| OPERATOR: FORKLIFT | $33.09 | $3.00 | $36.09 |
| OPERATOR: EXCAVATOR | $30.31 | $10.81 | $41.12 |
| OPERATOR: BULLDOZER | $30.24 | $10.26 | $40.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.05 | $8.54 | $30.59 |
| LABORER: MASON TENDER - BRICK | $21.47 | $8.29 | $29.76 |
| LABORER: DEMOLITION | $20.58 | $9.47 | $30.05 |
| IRONWORKER, STRUCTURAL | $26.01 | $12.18 | $38.19 |
| BRICKLAYER | $27.50 | $12.35 | $39.85 |
| CARPENTER (FORM WORK ONLY) | $29.81 | $23.45 | $53.26 |
| LABORER (TAMPER - HAND HELD) | $25.79 | $16.19 | $41.98 |
| LABORER (SCAFFOLD BUILDER) | $24.04 | $16.35 | $40.39 |
| LABORER (PIPELAYER) | $24.34 | $16.41 | $40.75 |
| LABORER (MORTAR MIXER) | $24.35 | $16.20 | $40.55 |
| LABORER (LANDSCAPE) | $23.63 | $16.43 | $40.06 |
| LABORER (GRADE CHECKER) | $24.24 | $16.27 | $40.51 |
| LABORER (CONCRETE WORKER) | $24.29 | $16.27 | $40.56 |
| LABORER (CHIPPING GUN) | $24.78 | $16.25 | $41.03 |
| LABORER (CARPENTER TENDER) | $24.19 | $16.23 | $40.42 |
| PLUMBER | $36.58 | $24.58 | $61.16 |