WI20260006: rev 0 → rev 1

1 rate change(s), 10 added, 8 removed.

Rate changes

ClassificationOld rateNew rateΔ rateOld fringeNew fringe
ELEVATOR MECHANIC$62.52$62.520.00$38.44$38.44

Added classifications

EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$41.60$27.89
EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$43.13$27.89
HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$45.20$27.89
PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$45.73$27.89
LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$49.28$27.89
PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$50.53$27.89
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS NOTE: MASON TENDER $1.00 OVER GENERAL LABORER$36.65$19.97
LABORER, GENERAL. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER$37.70$19.97
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS NOTE: MASON TENDER $1.00 OVER GENERAL LABORER$36.65$19.97
LABORER, GENERAL. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER$37.70$19.97

Removed classifications

OPERATOR: Power Equipment - Group 1was $50.53
OPERATOR: Power Equipment - Group 2was $49.28
OPERATOR: Power Equipment - Group 3was $45.73
OPERATOR: Power Equipment - Group 4was $45.20
OPERATOR: Power Equipment - Group 5was $43.13
OPERATOR: Power Equipment - Group 6was $41.60
Laborer, Generalwas $37.70
Laborer: Asbestos/hazardous material remover (Preparation, Removal and Encapsulation of Hazardous Materials from Non-Mechanical Systems)was $36.65