Heavy construction wages: Clark, Skamania, Washington
Wage determination WA20260137 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WA20260137 on · latest revision 1 · verify at sam.gov/wage-determination/WA20260137/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 | $88.71 |
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 |
| LINE CONSTRUCTION: (GROUND PERSON) | $37.53 | $17.74 | $55.27 |
| ELECTRICIAN | $60.00 | $27.78 | $87.78 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (BACKHOE, ROBOTIC, TRACK AND WHEEL TYPE UP TO AND INCLUDING TWENTY THOUSAND (20,000) LBS. WITH ANY ATTACHMENTS; EXCAVATOR OPERATOR OVER TWENTY THOUSAND (20,000) LBS. THROUGH EIGHTY-FIVE THOUSAND (85,000) LBS) | $52.55 | $17.15 | $69.70 |
| OPERATOR: CONCRETE PUMP | $51.31 | $17.15 | $68.46 |
| OPERATOR: LOADER (LOADERS, RUBBER-TIRED TYPE, LESS THAN TWENTY-FIVE THOUSAND (25,000) LBS.) | $51.31 | $17.15 | $68.46 |
| OPERATOR: LOADER (LOADER OPERATOR, FRONT END AND OVERHEAD, TWENTY-FIVE THOUSAND (25,000) LBS. AND LESS THAN SIXTY THOUSAND (60,000) LBS.) | $52.55 | $17.15 | $69.70 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $52.55 | $17.15 | $69.70 |
| OPERATOR: ROLLER | $51.31 | $17.15 | $68.46 |
| OPERATOR: CRANE (UNDER FIFTY (50) TONS) | $52.55 | $17.15 | $69.70 |
| OPERATOR: SCRAPER (SELF-PROPELLED UNDER 45 YARDS) | $52.55 | $17.15 | $69.70 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $51.31 | $17.15 | $68.46 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE; TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $48.09 | $17.15 | $65.24 |
| OPERATOR: MECHANIC | $52.55 | $17.15 | $69.70 |
| OPERATOR: DRILL (DRILLING MACHINE; DIRECTIONAL DRILL OVE 20,000 LBS.) | $52.55 | $17.15 | $69.70 |
| OPERATOR: DRILL (DIRECTIONAL DRILL LOCATOR) | $48.09 | $17.15 | $65.24 |
| OPERATOR: DRILL (DIRECTIONAL DRILL LESS THAN 20,000 LBS.) | $51.31 | $17.15 | $68.46 |
| OPERATOR: BULLDOZER (OVER 70,000 LBS. UP TO AND INCLUDING 120,000 LBS.) | $55.88 | $17.15 | $73.03 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 |
| LABORER: COMMON OR GENERAL | $44.06 | $15.60 | $59.66 |
| LABORER: PIPELAYER | $37.80 | $16.90 | $54.70 |
| PAINTER | $41.24 | $14.70 | $55.94 |
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 |
| TRUCK DRIVER: DUMP TRUCK | $34.09 | $15.63 | $49.72 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $30.61 | $10.89 | $41.50 |
| TRAFFIC CONTROL: FLAGGER | $27.75 | $11.15 | $38.90 |
| OPERATOR: GRADER/BLADE | $40.28 | $16.17 | $56.45 |
| OPERATOR: FORKLIFT | $45.93 | $19.20 | $65.13 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.60 | $0.00 | $43.60 |
| LABORER: FENCE ERECTOR | $30.21 | $0.00 | $30.21 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $38.46 | $0.00 | $38.46 |
| LABORER: HOD CARRIER | $35.06 | $10.94 | $46.00 |
| LABORER: CONCRETE SAW CHAIN | $37.30 | $4.30 | $41.60 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $37.63 | $11.25 | $48.88 |
| IRONWORKER | $43.29 | $25.63 | $68.92 |
| GRADE CHECKER | $35.58 | $0.00 | $35.58 |
| CEMENT MASON/CONCRETE FINISHER | $39.33 | $0.00 | $39.33 |
| CARPENTER | $32.00 | $15.30 | $47.30 |
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.