Heavy construction wages: Snohomish, Washington
Wage determination WA20260129 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WA20260129 on · latest revision 1 · verify at sam.gov/wage-determination/WA20260129/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $55.34 | $20.05 | $75.39 |
| PILEDRIVER PERSON | $65.53 | $19.13 | $84.66 |
| FORM WORKER | $63.98 | $19.13 | $83.11 |
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 | $88.71 |
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 |
| LINE CONSTRUCTION: (CABLE SPLICER) | $64.17 | $24.77 | $88.94 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $55.19 | $20.94 | $76.13 |
| LINE CONSTRUCTION: (GROUND PERSON) | $37.53 | $17.74 | $55.27 |
| OPERATOR: DRILL (DRILLING MACHINE) | $62.85 | $27.57 | $90.42 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | $61.14 | $27.57 | $88.71 |
| OPERATOR: LOADER (OVERHEAD 8 YARDS & OVER) | $61.93 | $27.57 | $89.50 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | $62.85 | $27.57 | $90.42 |
| OPERATOR: SCRAPER (SELF PROPELLED UNDER 45) | $61.14 | $27.57 | $88.71 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $60.46 | $27.57 | $88.03 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT) | $61.14 | $27.57 | $88.71 |
| OPERATOR: GRADER/BLADE | $61.93 | $27.57 | $89.50 |
| OPERATOR: CONCRETE PUMP | $61.14 | $27.57 | $88.71 |
| OPERATOR: BULLDOZER (D9 & UNDER) | $60.46 | $27.57 | $88.03 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | $61.93 | $27.57 | $89.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | $61.14 | $27.57 | $88.71 |
| IRONWORKER | $57.94 | $34.52 | $92.46 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 |
| LABORER: PIPELAYER | $51.52 | $16.99 | $68.51 |
| LABORER: CONCRETE SAW CHAIN | $51.52 | $16.99 | $68.51 |
| PAINTER | $41.24 | $14.70 | $55.94 |
| PLUMBER | $60.72 | $34.15 | $94.87 |
| PIPEFITTER | $75.21 | $33.88 | $109.09 |
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 |
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 |
| TRAFFIC CONTROL: FLAGGER | $32.81 | $10.54 | $43.35 |
| OPERATOR: SCREED | $49.96 | $9.66 | $59.62 |
| OPERATOR: ROLLER | $43.21 | $19.20 | $62.41 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.35 | $13.44 | $45.79 |
| OPERATOR: MILLING MACHINE | $48.95 | $10.33 | $59.28 |
| OPERATOR: MECHANIC | $37.11 | $19.20 | $56.31 |
| OPERATOR: FORKLIFT | $49.89 | $0.00 | $49.89 |
| OPERATOR: CRANE | $43.59 | $17.94 | $61.53 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $51.50 | $0.00 | $51.50 |
| MILLWRIGHT | $51.09 | $8.85 | $59.94 |
| LABORER: FENCE ERECTOR | $29.01 | $0.00 | $29.01 |
| LABORER: LANDSCAPE | $27.40 | $0.00 | $27.40 |
| LABORER: HOD CARRIER | $38.58 | $10.89 | $49.47 |
| LABORER: COMMON OR GENERAL | $34.00 | $10.70 | $44.70 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $41.71 | $6.33 | $48.04 |
| ELECTRICIAN | $39.74 | $13.97 | $53.71 |
| CEMENT MASON/CONCRETE FINISHER | $49.31 | $0.00 | $49.31 |
| CARPENTER, EXCLUDES FORM WORK | $44.48 | $15.52 | $60.00 |
| TRUCK DRIVER: DUMP TRUCK | $55.48 | $27.52 | $83.00 |
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 |
| GRADE CHECKER | $48.64 | $18.82 | $67.46 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $39.00 | $14.40 | $53.40 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.