Building construction wages: Yakima, Washington
Wage determination WA20260119 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WA20260119 on · latest revision 1 · verify at sam.gov/wage-determination/WA20260119/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 | $94.19 |
| BRICKLAYER | $39.57 | $20.50 | $60.07 |
| TILE SETTER | $36.35 | $14.57 | $50.92 |
| TILE FINISHER | $27.26 | $11.99 | $39.25 |
| CARPENTER | $44.21 | $17.28 | $61.49 |
| ELECTRICIAN | $60.00 | $27.78 | $87.78 |
| OPERATOR: BULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 |
| OPERATOR: BLADE FINISH (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 |
| OPERATOR: GRADER/BLADE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 |
| OPERATOR: LOADER: OVERHEAD UNDER 6 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 |
| OPERATOR: LOADER: OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 |
| IRONWORKER | $57.94 | $34.52 | $92.46 |
| LABORER: FORM STRIPPING | $50.38 | $16.96 | $67.34 |
| LABORER: JACKHAMMER | $51.52 | $16.99 | $68.51 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 |
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 | $67.34 |
| LABORER: FIRE WATCH | $40.56 | $15.60 | $56.16 |
| LABORER: HOD CARRIER | $48.14 | $15.60 | $63.74 |
| SCAFFOLD BUILDER | $44.06 | $15.60 | $59.66 |
| PAINTER | $41.24 | $14.70 | $55.94 |
| PIPEFITTER | $65.20 | $34.91 | $100.11 |
| ROOFER, EXCLUDES METAL ROOFS | $48.01 | $16.44 | $64.45 |
| SHEETMETAL WORKER (INCLUDING METAL ROOFING) | $50.00 | $28.41 | $78.41 |
| SPRINKLER FITTER | $25.80 | $8.32 | $34.12 |
| PLUMBER | $47.74 | $28.52 | $76.26 |
| OPERATOR: ROLLER | $42.04 | $12.79 | $54.83 |
| OPERATOR: OILER | $36.39 | $16.62 | $53.01 |
| OPERATOR: MECHANIC | $40.77 | $15.91 | $56.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 | $50.09 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $37.76 | $7.02 | $44.78 |
| LABORER: PIPELAYER | $32.17 | $11.49 | $43.66 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.66 | $9.76 | $36.42 |
| LABORER: CONCRETE SAW CHAIN | $35.03 | $10.86 | $45.89 |
| LABORER: COMMON OR GENERAL | $27.94 | $7.89 | $35.83 |
| CEMENT MASON/CONCRETE FINISHER | $28.26 | $9.29 | $37.55 |
| TRUCK DRIVER: CONCRETE TRUCK | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: DUMP TRUCK (LESS THAN 16 YARD CAPACITY) | $53.84 | $27.52 | $81.36 |
| TRUCK DRIVER: DUMP TRUCK (16 TO 30 YARD CAPACITY) | $54.68 | $27.52 | $82.20 |
| OPERATOR: CONCRETE PUMP | $52.92 | $22.63 | $75.55 |
| OPERATOR: DRILL | $56.42 | $21.15 | $77.57 |
| OPERATOR: CRANE | $53.35 | $17.57 | $70.92 |
| LABORER: GRADE CHECKER | $45.01 | $18.51 | $63.52 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.