Building construction wages: Pierce, Washington
Wage determination WA20260111 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WA20260111 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/WA20260111/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 | $94.19 |
| TILE SETTER | $49.70 | $18.62 | $68.32 |
| TILE FINISHER | $40.98 | $18.17 | $59.15 |
| BRICKLAYER | $55.34 | $20.05 | $75.39 |
| TERRAZZO WORKER/SETTER | $51.70 | $18.62 | $70.32 |
| TERRAZZO FINISHER | $40.98 | $18.17 | $59.15 |
| MASON - STONE | $55.34 | $20.05 | $75.39 |
| MARBLE SETTER | $49.70 | $18.62 | $68.32 |
| MARBLE FINISHER | $40.98 | $18.17 | $59.15 |
| MILLWRIGHT | $55.39 | $22.38 | $77.77 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK) | $63.98 | $19.13 | $83.11 |
| ELECTRICIAN | $65.14 | $26.56 | $91.70 |
| POWER EQUIPMENT OPERATOR: DOZER (D-9 & UNDER) | $59.96 | $27.32 | $87.28 |
| OPERATOR: SCREED | $61.41 | $27.32 | $88.73 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $61.41 | $27.32 | $88.73 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $59.96 | $27.32 | $87.28 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE; TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $60.63 | $27.32 | $87.95 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | $60.63 | $27.32 | $87.95 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT IINCLUDING 8 YARDS) | $61.41 | $27.32 | $88.73 |
| OPERATOR: GRADER/BLADE | $61.41 | $27.32 | $88.73 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | $60.63 | $27.32 | $87.95 |
| OPERATOR: BLADE FINISH | $61.41 | $27.32 | $88.73 |
| IRONWORKER | $57.94 | $34.52 | $92.46 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $50.38 | $16.96 | $67.34 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $52.31 | $17.01 | $69.32 |
| LABORER: FORM STRIPPING | $50.38 | $16.96 | $67.34 |
| LABORER: GRADE CHECKER | $52.31 | $17.01 | $69.32 |
| LABORER: JACKHAMMER | $51.52 | $16.99 | $68.51 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 |
| SCAFFOLD BUILDER | $50.38 | $16.96 | $67.34 |
| TRAFFIC CONTROL: FLAGGER | $40.88 | $16.72 | $57.60 |
| LABORER: CONCRETE SAW CHAIN | $51.52 | $16.99 | $68.51 |
| LABORER: HOD CARRIER | $53.99 | $17.05 | $71.04 |
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 | $67.34 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $53.99 | $17.05 | $71.04 |
| LABORER: FIRE WATCH | $40.56 | $15.60 | $56.16 |
| GLAZIER | $61.14 | $23.76 | $84.90 |
| PAINTER | $41.24 | $14.70 | $55.94 |
| DRYWALL FINISHER/TAPER | $53.59 | $23.65 | $77.24 |
| FLOOR LAYER: SOFT FLOORS | $42.01 | $20.20 | $62.21 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 |
| PLASTERER | $52.50 | $20.67 | $73.17 |
| PIPEFITTER | $60.72 | $34.15 | $94.87 |
| PLUMBER | $60.72 | $34.15 | $94.87 |
| ROOFER | $48.01 | $16.44 | $64.45 |
| SPRINKLER FITTER | $68.89 | $33.80 | $102.69 |
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 |
| OPERATOR: MECHANIC | $42.85 | $19.20 | $62.05 |
| OPERATOR: CRANE | $39.05 | $18.34 | $57.39 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 | $50.09 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.16 | $17.40 | $56.56 |
| LABORER: PIPELAYER | $35.83 | $10.89 | $46.72 |
| LABORER: LANDSCAPE | $18.22 | $5.60 | $23.82 |
| LABORER: COMMON OR GENERAL | $35.58 | $10.89 | $46.47 |
| TRUCK DRIVER: CONCRETE TRUCK | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: DUMP TRUCK (LESS THAN 16 YARD CAPACITY) | $54.59 | $27.52 | $82.11 |
| TRUCK DRIVER: DUMP TRUCK (16 TO 30 YARD CAPACITY) | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: PICKUP TRUCK | $51.78 | $27.52 | $79.30 |
| OPERATOR: DRILL | $56.42 | $21.15 | $77.57 |