Building construction wages: Kitsap, Washington
Wage determination WA20260109 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WA20260109 on · latest revision 1 · verify at sam.gov/wage-determination/WA20260109/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 | $94.19 |
| TILE SETTER | $49.70 | $18.62 | $68.32 |
| TILE FINISHER | $40.98 | $18.17 | $59.15 |
| BRICKLAYER | $55.34 | $20.05 | $75.39 |
| CARPENTER (INCLUDES DRYWALL HANGER) | $63.98 | $19.13 | $83.11 |
| ELECTRICIAN | $75.96 | $33.48 | $109.44 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $60.93 | $27.57 | $88.50 |
| OPERATOR: GRADER/BLADE | $60.93 | $27.57 | $88.50 |
| OPERATOR: BULLDOZER (D9 & UNDER) | $59.49 | $27.57 | $87.06 |
| OPERATOR: BLADE FINISH | $60.14 | $27.57 | $87.71 |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | $59.49 | $27.57 | $87.06 |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | $55.68 | $27.57 | $83.25 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $59.49 | $27.57 | $87.06 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $60.14 | $27.57 | $87.71 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | $60.14 | $27.57 | $87.71 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | $60.93 | $27.57 | $88.50 |
| OPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $60.93 | $27.57 | $88.50 |
| OPERATOR: CRANE (20 TONS THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) | $60.14 | $27.57 | $87.71 |
| OPERATOR: CRANE (100 TONS THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $61.83 | $27.57 | $89.40 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | $60.93 | $27.57 | $88.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (UNDER 15 METRIC TONS) | $59.49 | $27.57 | $87.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | $60.93 | $27.57 | $88.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | $60.14 | $27.57 | $87.71 |
| IRONWORKER | $57.94 | $34.52 | $92.46 |
| LABORER: FORM STRIPPING | $50.38 | $16.96 | $67.34 |
| LABORER: GRADE CHECKER | $52.31 | $17.01 | $69.32 |
| LABORER: JACKHAMMER | $51.52 | $16.99 | $68.51 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 |
| LABORER: CONCRETE SAW CHAIN | $51.52 | $16.99 | $68.51 |
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 | $67.34 |
| LABORER: FIRE WATCH | $40.56 | $15.60 | $56.16 |
| PAINTER | $41.24 | $14.70 | $55.94 |
| DRYWALL FINISHER/TAPER | $53.59 | $23.65 | $77.24 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 |
| PLASTERER | $52.50 | $20.67 | $73.17 |
| PIPEFITTER | $60.72 | $34.15 | $94.87 |
| PLUMBER | $60.72 | $34.15 | $94.87 |
| ROOFER | $48.01 | $16.44 | $64.45 |
| SPRINKLER FITTER | $68.89 | $33.80 | $102.69 |
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 |
| TRUCK DRIVER: DUMP TRUCK | $45.47 | $7.05 | $52.52 |
| OPERATOR: MECHANIC | $45.17 | $19.20 | $64.37 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 | $50.09 |
| LABORER: PIPELAYER | $35.83 | $10.89 | $46.72 |
| LABORER: COMMON OR GENERAL | $36.24 | $10.89 | $47.13 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $42.25 | $0.00 | $42.25 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $35.54 | $10.89 | $46.43 |
| TRUCK DRIVER: CONCRETE TRUCK | $55.43 | $27.52 | $82.95 |
| OPERATOR: DRILL | $56.42 | $21.15 | $77.57 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.