Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 | $94.19 |
| TILE SETTER | $49.70 | $18.62 | $68.32 |
| TILE FINISHER | $40.98 | $18.17 | $59.15 |
| BRICKLAYER | $55.34 | $20.05 | $75.39 |
| TERRAZZO WORKER/SETTER | $51.70 | $18.62 | $70.32 |
| TERRAZZO FINISHER | $40.98 | $18.17 | $59.15 |
| MASON - STONE | $55.34 | $20.05 | $75.39 |
| MARBLE SETTER | $49.70 | $18.62 | $68.32 |
| MARBLE FINISHER | $40.98 | $18.17 | $59.15 |
| MILLWRIGHT | $55.39 | $22.38 | $77.77 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC & DRY HANGER) | $63.98 | $19.13 | $83.11 |
| ELECTRICIAN | $75.96 | $33.48 | $109.44 |
| OPERATOR: SCREED | $61.14 | $25.57 | $86.71 |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | $60.46 | $27.57 | $88.03 |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | $56.63 | $27.57 | $84.20 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $60.46 | $27.57 | $88.03 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $61.14 | $27.57 | $88.71 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | $61.14 | $27.57 | $88.71 |
| OPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $61.93 | $27.75 | $89.68 |
| OPERATOR: CRANE (20 TONS THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) | $61.14 | $27.75 | $88.89 |
| OPERATOR: CRANE (100 TONS THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $62.85 | $27.75 | $90.60 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | $61.93 | $27.57 | $89.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (UNDER 15 METRIC TONS) | $60.46 | $27.57 | $88.03 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | $61.93 | $27.57 | $89.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | $61.14 | $27.57 | $88.71 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $61.93 | $27.57 | $89.50 |
| OPERATOR: GRADER/BLADE | $61.93 | $27.57 | $89.50 |
| OPERATOR: BULLDOZER (D9 & UNDER) | $60.46 | $27.57 | $88.03 |
| OPERATOR: BLADE FINISH | $61.14 | $27.57 | $88.71 |
| IRONWORKER | $57.94 | $34.52 | $92.46 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $50.38 | $16.96 | $67.34 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $52.31 | $17.01 | $69.32 |
| LABORER: COMMON OR GENERAL | $50.38 | $16.96 | $67.34 |
| LABORER: CONCRETE SAW CHAIN | $51.52 | $16.99 | $68.51 |
| LABORER: FORM STRIPPING | $50.38 | $16.96 | $67.34 |
| LABORER: HOD CARRIER | $52.31 | $17.01 | $69.32 |
| LABORER: GRADE CHECKER | $52.31 | $17.01 | $69.32 |
| LABORER: JACKHAMMER | $51.52 | $16.99 | $68.51 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 |
| SCAFFOLD BUILDER | $50.38 | $16.96 | $67.34 |
| TRAFFIC CONTROL: FLAGGER | $40.88 | $16.72 | $57.60 |
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 | $67.34 |
| LABORER: FIRE WATCH | $40.56 | $15.60 | $56.16 |
| GLAZIER | $61.14 | $23.76 | $84.90 |
| PAINTER | $41.24 | $14.70 | $55.94 |
| DRYWALL FINISHER/TAPER | $53.59 | $23.65 | $77.24 |
| FLOOR LAYER: SOFT FLOORS | $42.01 | $20.20 | $62.21 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 |
| PLASTERER | $52.50 | $20.67 | $73.17 |
| PIPEFITTER | $75.21 | $33.88 | $109.09 |
| PLUMBER | $75.21 | $33.88 | $109.09 |
| ROOFER | $48.01 | $16.44 | $64.45 |
| SPRINKLER FITTER | $68.89 | $33.80 | $102.69 |
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 |
| OPERATOR: MECHANIC | $42.85 | $19.20 | $62.05 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 | $50.09 |
| LABORER: LANDSCAPE | $18.41 | $3.20 | $21.61 |
| TRUCK DRIVER: CONCRETE TRUCK | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: DUMP TRUCK (LESS THAN 16 YARD CAPACITY) | $54.59 | $27.52 | $82.11 |
| TRUCK DRIVER: DUMP TRUCK (16 TO 30 YARD CAPACITY) | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: PICKUP TRUCK | $51.78 | $27.52 | $79.30 |
| OPERATOR: DRILL | $56.42 | $21.15 | $77.57 |
| LABORER: PIPELAYER | $45.61 | $14.40 | $60.01 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.