Residential construction wages: Skagit, Whatcom, Washington

Wage determination WA20260101 · Active · Standard · verify on SAM.gov

SkagitWhatcom

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
BRICKLAYER$55.34$20.05$75.39
ELECTRICIAN$29.02$10.83$39.85
ELEVATOR MECHANIC$67.61$38.44$106.05
LABORER: MASON TENDER - CEMENT/CONCRETE$38.05$16.75$54.80
LABORER: MASON TENDER - BRICK$50.38$16.96$67.34
CEMENT MASON/CONCRETE FINISHER$31.30$15.53$46.83
SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION)$52.84$31.16$84.00
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$20.84$7.30$28.14
ROOFER$23.12$2.90$26.02
PLUMBER$25.86$2.76$28.62
PAINTER: BRUSH, ROLLER, AND SPRAY$24.75$5.91$30.66
OPERATOR: BULLDOZER$29.63$0.00$29.63
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$17.53$0.00$17.53
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$26.41$0.00$26.41
LABORER: COMMON OR GENERAL$15.21$0.00$15.21
CARPENTER$19.31$10.65$29.96
TRUCK DRIVER: GROUP 8 TRUCKS, SIDE, END, BOTTOM AND ARTICULATED END DUMP (OVER 100 YDS.)$37.88$20.93$58.81
TRUCK DRIVER: GROUP 7 TRUCK, SIDE, END, BOTTOM AND ARTICULATED END DUMP (OVER 40 YDS. TO & INCLUDING 100 YDS.)$37.56$20.93$58.49
TRUCK DRIVER: GROUP 6 TRUCKS, SIDE, END, BOTTOM AND ARTICULATED END DUMP (OVER 20 YDS. TO & INCLUDING 40 YDS.)$37.22$20.93$58.15
TRUCK DRIVER: GROUP 5 TRUCKS, SIDE, END, BOTTOM AND ARTICULATED END DUMP (OVER 12 YDS. TO & INCLUDING 20 YDS.)$37.02$20.93$57.95
TRUCK DRIVER: GROUP 4 TRUCKS, SIDE, END, BOTTOM AND ARTICULATED END DUMP (OVER 6 YDS. TO & INCLUDING 12 YDS.)$36.91$20.93$57.84
TRUCK DRIVER: GROUP 3 TRUCKS, SIDE, END, BOTTOM AND ARTICULATED END DUMP (3 YARDS TO AND INCLUDING 6 YDS.)$36.58$20.93$57.51