Heavy construction wages: Ferry, Garfield, Washington

Wage determination WA20260062 · Active · Standard · verify on SAM.gov

FerryGarfield

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-23original

Current rates (rev 2)

Download CSV
ClassificationRateFringeTotal
ELECTRICIAN (FERRY COUNTY)$49.55$19.09$68.64
LINE CONSTRUCTION: LINEMEN$60.54$24.88$85.42
ELECTRICIAN$60.00$27.78$87.78
(FERRY COUNTY)$45.36$23.40$68.76
COUNTY)$43.39$23.40$66.79
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC - (FERRY COUNTY)$43.05$23.40$66.45
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); DRILLING EQUIPMENT (8 UNCH BIT AND OVER) (ROBBINS, REVERSE CIRCULATION AND SIMILAR); BOOM TRUCK (UNDER 25 TONS) - (FERRY COUNTY)$42.71$23.40$66.11
(FERRY COUNTY)$42.51$23.40$65.91
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) - (FERRY COUNTY)$42.31$23.40$65.71
(FERRY COUNTY)$41.56$23.40$64.96
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS - (FERRY COUNTY)$41.17$23.40$64.57
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) - (GARFIELD COUNTY)$42.36$23.40$65.76
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE - (GARFIELD COUNTY)$40.39$23.40$63.79
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC - (GARFIELD COUNTY)$40.05$23.40$63.45
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); DRILLING EQUIPMENT (8 UNCH BIT AND OVER) (ROBBINS, REVERSE CIRCULATION AND SIMILAR); BOOM TRUCK (UNDER 25 TONS) - (GARFIELD COUNTY)$39.71$23.40$63.11
(GARFIELD COUNTY)$39.51$23.40$62.91
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) - (GARFIELD COUNTY)$39.31$23.40$62.71
COUNTY)$38.17$23.40$61.57
POWER EQUIPMENT OPERATOR: GARFIELD COUNTY$38.56$23.40$61.96
IRONWORKER (REINFORCING AND STRUCTURAL)$43.40$32.77$76.17
LABORER, MASON TENDER BRICK$38.05$16.75$54.80
LABORER: A-1: GROUP 10 GRADE CHECKER - (GARFIELD COUNTY)$40.21$16.90$57.11
LABORER: A-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS - (GARFIELD COUNTY)$37.46$16.90$54.36
COUNTY)$37.13$16.90$54.03
LABORER: A-1: GROUP 1 FLAGGER - (GARFIELD COUNTY)$34.03$16.90$50.93
LABORER: A-2: GROUP 10 GRADE CHECKER - (FERRY COUNTY)$43.21$16.90$60.11
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS - (FERRY COUNTY)$40.46$16.90$57.36
LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER - (FERRY COUNTY)$40.13$16.90$57.03
LABORER: A-2: GROUP 1 FLAGGER - (FERRY COUNTY)$37.03$16.90$53.93
PAINTER (BRUSH, ROLLER, AND SPRAY.)$36.26$17.01$53.27
TRUCK DRIVER: 10 YARD TRUCK$24.61$8.34$32.95
TRUCK DRIVER: WATER TRUCK$24.36$8.30$32.66
TRUCK DRIVER: DUMP TRUCK$19.67$0.00$19.67
LABORER: LANDSCAPE$14.67$0.00$14.67
CEMENT MASON/CONCRETE FINISHER$17.21$0.00$17.21
CARPENTER$24.03$6.50$30.53