Heavy construction wages: Island, Washington
Wage determination WA20260047 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WA20260047 on · latest revision 1 · verify at sam.gov/wage-determination/WA20260047/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $63.98 | $19.13 | $83.11 |
| ELECTRICIAN (ISLAND, SAN JUAN, SKAGIT, SNOHOMISH AND WHATCOM COUNTIES) | $53.20 | $27.51 | $80.71 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 CRANES-A FRAME-10 TONS AND UNDER; ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS; BOOM TRUCK 10 TONS AND UNDER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | $55.43 | $27.57 | $83.00 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; A-FRAME CRANE OVER 10 TONS;; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS; OILER; GRADER (NON-FINISHING);BOOM TRUCK OVER 10 TONS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | $59.23 | $27.57 | $86.80 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; CRANE-OVERHEAD, BRIDGE TYPE-20 TONS THROUGH 44 TONS;; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC; DRILLING MACHINE; GRADER (FINISHING) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | $59.88 | $27.57 | $87.45 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | $63.35 | $27.57 | $90.92 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); TOWER CRANE OVER 175 FT IN HEIGHT, BASE TO BOOM; EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | $62.47 | $27.57 | $90.04 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 100 TONS AND OVER; TOWER CRANE UP TO 175 FT IN HEIGHT BASE TO BOOM; LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | $61.56 | $27.57 | $89.13 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 45 TONS THRU 99 TONS; DERRICKS ON BUILDING WORK;; EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | $60.67 | $27.57 | $88.24 |
| IRONWORKER (REINFORCING & STRUCTURAL) | $57.94 | $34.52 | $92.46 |
| LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $52.31 | $17.01 | $69.32 |
| LABORER: ZONE 1: GROUP 4 PIPE LAYER; CHIPPING GUNS (OVER 30 LBS); GROUTMEN ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $51.52 | $16.99 | $68.51 |
| LABORER: ZONE 1: GROUP 3 GENERAL OR COMMON LABORER; CHIPPING GUNS (UNDER 30 LBS) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $50.38 | $16.96 | $67.34 |
| LABORER: ZONE 1: GROUP 2 FLAGGER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $40.88 | $16.72 | $57.60 |
| PAINTER (BRUSH, ROLLER AND SPRAY) | $41.24 | $14.70 | $55.94 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 |
| TRUCK DRIVER: 10 YARD TRUCK | $24.61 | $8.34 | $32.95 |
| TRUCK DRIVER: WATER TRUCK | $24.36 | $8.30 | $32.66 |
| PIPEFITTER | $30.00 | $8.35 | $38.35 |
| LABORER: LANDSCAPE | $14.67 | $0.00 | $14.67 |
| TRUCK DRIVER: ZONE A: GROUP 2: DUMP TRUCKS, SIDE, END AND BOTTOM DUMP, INCLUDING SEMI-TRUCKS AND TRAINS OR COMBINATIONS THEREOF WITH LESS THAN 16 YARDS CAPACITY. ZONE B (25-45 MILES FROM CENTER OF LISTED CITIES*): ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C (OVER 45 MILES FROM CENTR OF LISTED CITIES*): ADD $1.00 PER HOUR TO ZONE A RATES | $54.59 | $27.52 | $82.11 |
| TRUCK DRIVER: ZONE A: GROUP 1: DUMP TRUCKS, SIDE, END AND BOTTOM DUMP, INCLUDING SEMI-TRUCKS AND TRAINS OR COMBINATIONS THEREOF WITH 16 YARDS TO 30 YARDS CAPACITY: OVER 30 YARDS $.15 PER HOUR ADDITIONAL FOR EACH 10 YARD INCREMENT. ZONE B (25-45 MILES FROM CENTER OF LISTED CITIES*): ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C (OVER 45 MILES FROM CENTR OF LISTED CITIES*): ADD $1.00 PER HOUR TO ZONE A RATES | $55.43 | $27.52 | $82.95 |