Building construction wages: Garfield, Washington
Wage determination WA20260025 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WA20260025 on July 24, 2026 · latest revision 2 · verify at sam.gov/wage-determination/WA20260025/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $33.95 | $19.33 | $53.28 |
| TILE SETTER | $29.86 | $13.95 | $43.81 |
| CARPENTER (INCLUDING DRYWALL HANGING AND FORM WORK) | $44.21 | $17.28 | $61.49 |
| ELECTRICIAN | $60.00 | $27.78 | $87.78 |
| POWER EQUIPMENT OPERATOR: GROUP 8 LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) | $42.36 | $23.40 | $65.76 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER) LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) | $40.39 | $23.40 | $63.79 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC | $40.05 | $23.40 | $63.45 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.) | $39.71 | $23.40 | $63.11 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) | $39.51 | $23.40 | $62.91 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) | $39.31 | $23.40 | $62.71 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT | $38.56 | $23.40 | $61.96 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS | $38.17 | $23.40 | $61.57 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $43.40 | $32.77 | $76.17 |
| LABORER, MASON TENDER BRICK | $38.05 | $16.75 | $54.80 |
| LABORER: A-1: GROUP 10 GRADE CHECKER | $40.21 | $16.90 | $57.11 |
| LABORER: A-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER | $37.46 | $16.90 | $54.36 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $33.95 | $15.65 | $49.60 |
| FLOOR LAYER: CARPET AND VINYL | $42.01 | $20.20 | $62.21 |
| CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| PIPEFITTER | $65.20 | $34.91 | $100.11 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | $35.75 | $14.40 | $50.15 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $44.30 | $28.58 | $72.88 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $50.00 | $28.41 | $78.41 |
| TRUCK DRIVER: DUMP TRUCK | $23.50 | $6.87 | $30.37 |
| PLUMBER | $35.00 | $0.00 | $35.00 |
| PIPE INSULATOR/WRAPPER | $24.21 | $4.07 | $28.28 |
| OPERATOR: CRANE | $25.53 | $0.00 | $25.53 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 | $27.94 |
| LABORER: COMMON OR GENERAL | $16.91 | $0.00 | $16.91 |