Building construction wages: Garfield, Washington
Wage determination WA20260025 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WA20260025 on · latest revision 2 · verify at sam.gov/wage-determination/WA20260025/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $33.95 | $19.33 | $53.28 |
| TILE SETTER | $29.86 | $13.95 | $43.81 |
| CARPENTER (INCLUDING DRYWALL HANGING AND FORM WORK) | $44.21 | $17.28 | $61.49 |
| ELECTRICIAN | $60.00 | $27.78 | $87.78 |
| POWER EQUIPMENT OPERATOR: GROUP 8 LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) | $42.36 | $23.40 | $65.76 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER) LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) | $40.39 | $23.40 | $63.79 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC | $40.05 | $23.40 | $63.45 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.) | $39.71 | $23.40 | $63.11 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) | $39.51 | $23.40 | $62.91 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) | $39.31 | $23.40 | $62.71 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT | $38.56 | $23.40 | $61.96 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS | $38.17 | $23.40 | $61.57 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $43.40 | $32.77 | $76.17 |
| LABORER, MASON TENDER BRICK | $38.05 | $16.75 | $54.80 |
| LABORER: A-1: GROUP 10 GRADE CHECKER | $40.21 | $16.90 | $57.11 |
| LABORER: A-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER | $37.46 | $16.90 | $54.36 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $33.95 | $15.65 | $49.60 |
| FLOOR LAYER: CARPET AND VINYL | $42.01 | $20.20 | $62.21 |
| CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| PIPEFITTER | $65.20 | $34.91 | $100.11 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | $35.75 | $14.40 | $50.15 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $44.30 | $28.58 | $72.88 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $50.00 | $28.41 | $78.41 |
| TRUCK DRIVER: DUMP TRUCK | $23.50 | $6.87 | $30.37 |
| PLUMBER | $35.00 | $0.00 | $35.00 |
| PIPE INSULATOR/WRAPPER | $24.21 | $4.07 | $28.28 |
| OPERATOR: CRANE | $25.53 | $0.00 | $25.53 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 | $27.94 |
| LABORER: COMMON OR GENERAL | $16.91 | $0.00 | $16.91 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.