Building construction wages: Adams, Washington

Wage determination WA20260021 · Active · Standard · verify on SAM.gov

Adams

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-23original

Current rates (rev 2)

Download CSV
ClassificationRateFringeTotal
BRICKLAYER$33.95$19.33$53.28
TILE SETTER$29.86$13.95$43.81
CARPENTER (INCLUDING DRYWALL HANGING AND FORM WORK)$44.21$17.28$61.49
ELECTRICIAN$49.55$19.09$68.64
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER)$45.36$23.40$68.76
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.)$43.39$23.40$66.79
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC$43.05$23.40$66.45
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER)$42.71$23.40$66.11
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T)$42.51$23.40$65.91
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT)$42.31$23.40$65.71
POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT$41.56$23.40$64.96
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS$41.17$23.40$64.57
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL$43.40$32.77$76.17
LABORER, MASON TENDER BRICK$38.05$16.75$54.80
LABORER: A-2: GROUP 10 GRADE CHECKER$43.21$16.90$60.11
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER$40.46$16.90$57.36
LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER$40.13$16.90$57.03
PAINTER (BRUSH & SPRAY ONLY)$33.95$15.65$49.60
CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE$40.89$18.64$59.53
PIPEFITTER$65.20$34.91$100.11
ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS)$35.75$14.40$50.15
SPRINKLER FITTER (FIRE SPRINKLERS)$44.30$28.58$72.88
SHEETMETAL WORKER (INCLUDING HVAC DUCT INSTALLATION)$45.83$27.92$73.75
TRUCK DRIVER, INCLUDES DUMP TRUCK$23.50$6.87$30.37
ROOFER: SINGLE PLY ROOF$26.77$0.68$27.45
PLUMBER$35.00$0.00$35.00
PIPE INSULATOR/WRAPPER$24.21$4.07$28.28
PAINTER: ROLLER$22.06$2.72$24.78
PAINTER: DRYWALL FINISHING/TAPING$25.17$4.41$29.58
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$27.94$0.00$27.94
METAL BUILDING ERECTOR$11.30$3.58$14.88