Heavy construction wages: Windsor, Vermont
Wage determination VT20260065 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VT20260065 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/VT20260065/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $19.00 | $0.00 | $19.00 |
| TRAFFIC CONTROL: FLAGGER | $14.85 | $0.29 | $15.14 |
| OPERATOR: ROLLER | $21.26 | $0.00 | $21.26 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.33 | $0.00 | $23.33 |
| OPERATOR: LOADER | $20.91 | $0.00 | $20.91 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.24 | $2.00 | $26.24 |
| LABORER: PIPELAYER | $21.31 | $3.13 | $24.44 |
| LABORER: LANDSCAPE | $17.87 | $3.81 | $21.68 |
| LABORER: COMMON OR GENERAL | $15.41 | $5.50 | $20.91 |
| ELECTRICIAN | $24.56 | $12.63 | $37.19 |
| CARPENTER, INCLUDES FORM WORK | $22.81 | $13.40 | $36.21 |