Heavy construction wages: Windham, Vermont
Wage determination VT20260064 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VT20260064 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/VT20260064/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $18.95 | $0.00 | $18.95 |
| TRAFFIC CONTROL: FLAGGER | $15.24 | $0.29 | $15.53 |
| OPERATOR: ROLLER | $21.26 | $0.00 | $21.26 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.33 | $0.00 | $23.33 |
| OPERATOR: LOADER | $22.01 | $0.00 | $22.01 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.48 | $3.26 | $25.74 |
| LABORER: COMMON OR GENERAL, INCLUDING LANDSCAPING AND PIPELAYING | $17.90 | $1.51 | $19.41 |
| ELECTRICIAN | $24.56 | $12.63 | $37.19 |
| CARPENTER, INCLUDES FORM WORK | $22.81 | $13.40 | $36.21 |