Heavy construction wages: Rutland, Vermont
Wage determination VT20260063 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VT20260063 on · latest revision 1 · verify at sam.gov/wage-determination/VT20260063/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $17.34 | $0.00 | $17.34 |
| TRAFFIC CONTROL: FLAGGER | $14.06 | $0.00 | $14.06 |
| OPERATOR: ROLLER | $21.26 | $0.00 | $21.26 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.33 | $0.00 | $23.33 |
| OPERATOR: LOADER | $21.33 | $3.55 | $24.88 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.95 | $3.60 | $23.55 |
| LABORER: COMMON OR GENERAL, INCLUDING LANDSCAPING AND PIPELAYING | $16.84 | $3.87 | $20.71 |
| ELECTRICIAN | $24.56 | $12.63 | $37.19 |
| CARPENTER, INCLUDES FORM WORK | $23.50 | $17.94 | $41.44 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.