Heavy construction wages: Rutland, Vermont
Wage determination VT20260063 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VT20260063 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/VT20260063/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $17.34 | $0.00 | $17.34 |
| TRAFFIC CONTROL: FLAGGER | $14.06 | $0.00 | $14.06 |
| OPERATOR: ROLLER | $21.26 | $0.00 | $21.26 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.33 | $0.00 | $23.33 |
| OPERATOR: LOADER | $21.33 | $3.55 | $24.88 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.95 | $3.60 | $23.55 |
| LABORER: COMMON OR GENERAL, INCLUDING LANDSCAPING AND PIPELAYING | $16.84 | $3.87 | $20.71 |
| ELECTRICIAN | $24.56 | $12.63 | $37.19 |
| CARPENTER, INCLUDES FORM WORK | $23.50 | $17.94 | $41.44 |