Highway construction wages: Essex, Vermont
Wage determination VT20260051 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VT20260051 on · latest revision 1 · verify at sam.gov/wage-determination/VT20260051/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $22.55 | $11.87 | $34.42 |
| TRUCK DRIVER, INCLUDES ALL AXLES INCLUDING DUMP TRUCKS | $18.75 | $4.01 | $22.76 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.20 | $6.71 | $23.91 |
| TRAFFIC CONTROL: FLAGGER | $12.29 | $2.75 | $15.04 |
| OPERATOR: SCREED | $20.87 | $7.24 | $28.11 |
| OPERATOR: ROLLER | $19.39 | $6.26 | $25.65 |
| OPERATOR: POUNDER | $22.31 | $0.00 | $22.31 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.54 | $5.53 | $26.07 |
| OPERATOR: MILLING MACHINE | $22.50 | $10.24 | $32.74 |
| OPERATOR: MECHANIC | $23.14 | $6.08 | $29.22 |
| OPERATOR: LOADER | $21.95 | $4.63 | $26.58 |
| OPERATOR: GRADER/BLADE | $21.13 | $5.53 | $26.66 |
| OPERATOR: DRILL | $19.83 | $3.94 | $23.77 |
| OPERATOR: CRANE | $23.42 | $2.38 | $25.80 |
| OPERATOR: BULLDOZER | $21.35 | $3.84 | $25.19 |
| OPERATOR: BROOM/SWEEPER | $19.25 | $5.97 | $25.22 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.78 | $5.09 | $24.87 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.83 | $3.91 | $25.74 |
| LABORER: LANDSCAPE | $14.70 | $1.03 | $15.73 |
| LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING AND CONCRETE WORK | $16.35 | $2.63 | $18.98 |
| IRONWORKER, STRUCTURAL | $28.77 | $7.91 | $36.68 |
| IRONWORKER, REINFORCING | $21.70 | $1.60 | $23.30 |
| INSTALLER - SIGN | $16.25 | $3.20 | $19.45 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $20.36 | $3.87 | $24.23 |
| ELECTRICIAN | $28.15 | $2.03 | $30.18 |
| CEMENT MASON/CONCRETE FINISHER | $25.34 | $0.00 | $25.34 |
| CARPENTER, INCLUDES FORM WORK | $20.00 | $1.64 | $21.64 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.