Residential construction wages: Greene + 3 more counties, Virginia
Wage determination VA20260151 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VA20260151 on · latest revision 1 · verify at sam.gov/wage-determination/VA20260151/1
GreeneBuckinghamFluvannaNelson
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS) | $39.99 | $18.05 | $58.04 |
| POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | $40.99 | $18.05 | $59.04 |
| TRUCK DRIVER: DUMP TRUCK | $16.30 | $0.00 | $16.30 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $18.71 | $0.00 | $18.71 |
| ROOFER | $15.61 | $2.02 | $17.63 |
| PLUMBER | $16.14 | $1.50 | $17.64 |
| PAINTER (BRUSH AND ROLLER) | $15.41 | $0.00 | $15.41 |
| OPERATOR: LOADER | $17.93 | $2.70 | $20.63 |
| OPERATOR: BULLDOZER | $15.29 | $2.27 | $17.56 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $15.26 | $0.80 | $16.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.36 | $2.25 | $19.61 |
| LABORER: PIPELAYER | $14.88 | $1.51 | $16.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.37 | $0.00 | $12.37 |
| LABORER: MASON TENDER - BRICK | $12.37 | $0.00 | $12.37 |
| LABORER: COMMON OR GENERAL | $11.49 | $0.00 | $11.49 |
| IRONWORKER, STRUCTURAL | $21.55 | $1.39 | $22.94 |
| IRONWORKER, ORNAMENTAL | $15.59 | $0.00 | $15.59 |
| ELECTRICIAN | $16.34 | $0.00 | $16.34 |
| CEMENT MASON/CONCRETE FINISHER | $16.84 | $0.00 | $16.84 |
| CARPENTER | $16.73 | $1.84 | $18.57 |
| BRICKLAYER | $16.35 | $0.00 | $16.35 |