Highway construction wages: Fairfax, Fairfax*, Falls Church*, Virginia
Wage determination VA20260116 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VA20260116 on · latest revision 1 · verify at sam.gov/wage-determination/VA20260116/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 | $50.98 |
| LABORER: COMMON OR GENERAL | $23.06 | $8.74 | $31.80 |
| LABORER: ASPHALT SHOVELER | $20.59 | $7.69 | $28.28 |
| LABORER: ASPHALT RAKER | $21.51 | $7.69 | $29.20 |
| CEMENT MASON/CONCRETE FINISHER | $20.70 | $8.03 | $28.73 |
| TRUCK DRIVER: SINGLE & MULTI AXLE | $18.94 | $3.02 | $21.96 |
| TRUCK DRIVER: HEAVY OVER 7 CY | $18.05 | $0.00 | $18.05 |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | $18.25 | $0.00 | $18.25 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $15.53 | $0.00 | $15.53 |
| TRAFFIC CONTROL: FLAGGER | $13.64 | $0.00 | $13.64 |
| PAVEMENT MARKING TRUCK DRIVER | $18.78 | $0.00 | $18.78 |
| PAVEMENT MARKING OPERATOR | $22.15 | $0.00 | $22.15 |
| OPERATOR: BULLDOZER, INCLUDING UTILITY | $20.64 | $0.00 | $20.64 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $20.50 | $2.16 | $22.66 |
| OPERATOR: SCREED | $22.13 | $4.89 | $27.02 |
| OPERATOR: ROLLER (FINISHING) | $18.73 | $3.23 | $21.96 |
| OPERATOR: ROLLER | $18.92 | $0.00 | $18.92 |
| OPERATOR: PILEDRIVER | $21.83 | $4.08 | $25.91 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $21.39 | $2.98 | $24.37 |
| OPERATOR: PAVEMENT PLANER GROUNDSMEN | $19.75 | $0.00 | $19.75 |
| OPERATOR: PAVEMENT PLANER | $21.14 | $0.00 | $21.14 |
| OPERATOR: MILLING MACHINE | $23.19 | $2.94 | $26.13 |
| OPERATOR: MECHANIC | $22.84 | $0.00 | $22.84 |
| OPERATOR: LOADER | $18.92 | $0.00 | $18.92 |
| OPERATOR: HYDROSEEDER | $16.64 | $0.00 | $16.64 |
| OPERATOR: GRADER/BLADE | $23.21 | $0.00 | $23.21 |
| OPERATOR: GRADALL | $19.26 | $0.00 | $19.26 |
| OPERATOR: DRILL | $24.89 | $0.00 | $24.89 |
| OPERATOR: CRANE | $29.46 | $0.00 | $29.46 |
| OPERATOR: BROOM/SWEEPER | $17.40 | $2.01 | $19.41 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.00 | $3.49 | $22.49 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.93 | $0.00 | $23.93 |
| LABORER: POWER TOOL OPERATOR | $15.69 | $0.00 | $15.69 |
| LABORER: PIPELAYER | $20.48 | $0.00 | $20.48 |
| LABORER: GRADE CHECKER | $14.88 | $0.00 | $14.88 |
| IRONWORKER, STRUCTURAL | $34.18 | $0.00 | $34.18 |
| IRONWORKER, REINFORCING | $34.18 | $0.00 | $34.18 |
| FENCE ERECTOR | $15.28 | $0.00 | $15.28 |
| CARPENTER, INCLUDES FORM WORK | $20.97 | $0.00 | $20.97 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.