Highway construction wages: Campbell, Lynchburg*, Virginia
Wage determination VA20260108 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VA20260108 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/VA20260108/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 | $50.98 |
| TRUCK DRIVER: SINGLE & MULTI AXLE | $16.58 | $0.00 | $16.58 |
| TRUCK DRIVER: HEAVY OVER 7 CY | $16.60 | $0.00 | $16.60 |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | $18.25 | $0.00 | $18.25 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $15.36 | $0.00 | $15.36 |
| TRAFFIC CONTROL: FLAGGER | $11.76 | $0.00 | $11.76 |
| OPERATOR: BULLDOZER, INCLUDING UTILITY | $17.99 | $0.00 | $17.99 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $16.51 | $0.00 | $16.51 |
| OPERATOR: SCREED | $22.13 | $4.89 | $27.02 |
| OPERATOR: ROLLER | $14.47 | $2.28 | $16.75 |
| OPERATOR: PILEDRIVER | $21.83 | $4.08 | $25.91 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $17.50 | $2.54 | $20.04 |
| OPERATOR: MILLING MACHINE | $23.12 | $3.60 | $26.72 |
| OPERATOR: MECHANIC | $20.60 | $0.00 | $20.60 |
| OPERATOR: LOADER | $18.39 | $0.00 | $18.39 |
| OPERATOR: HYDROSEEDER | $16.64 | $0.00 | $16.64 |
| OPERATOR: GRADER/BLADE | $26.13 | $0.00 | $26.13 |
| OPERATOR: GRADALL | $18.65 | $0.00 | $18.65 |
| OPERATOR: DRILL | $24.66 | $0.00 | $24.66 |
| OPERATOR: CRANE | $25.82 | $0.00 | $25.82 |
| OPERATOR: BROOM/SWEEPER | $14.32 | $0.25 | $14.57 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.16 | $4.45 | $23.61 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.53 | $0.00 | $18.53 |
| LABORER: POWER TOOL OPERATOR | $15.69 | $0.00 | $15.69 |
| LABORER: PIPELAYER | $15.11 | $0.00 | $15.11 |
| LABORER: GRADE CHECKER | $15.07 | $0.00 | $15.07 |
| LABORER: COMMON OR GENERAL | $12.82 | $0.00 | $12.82 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $15.40 | $0.00 | $15.40 |
| IRONWORKER, STRUCTURAL | $27.38 | $0.00 | $27.38 |
| IRONWORKER, REINFORCING | $22.71 | $0.00 | $22.71 |
| CEMENT MASON/CONCRETE FINISHER | $19.94 | $0.00 | $19.94 |
| CARPENTER, INCLUDES FORM WORK | $17.65 | $0.00 | $17.65 |