Highway construction wages: Patrick, Virginia
Wage determination VA20260085 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VA20260085 on · latest revision 1 · verify at sam.gov/wage-determination/VA20260085/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: MULTI AXLE | $17.58 | $0.77 | $18.35 |
| TRUCK DRIVER: HEAVY OVER 7 CY | $16.69 | $0.00 | $16.69 |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK | $15.80 | $0.00 | $15.80 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $16.69 | $0.00 | $16.69 |
| TRAFFIC CONTROL: FLAGGER | $11.45 | $0.00 | $11.45 |
| PAVEMENT MARKING TRUCK DRIVER | $19.00 | $0.00 | $19.00 |
| PAVEMENT MARKING OPERATOR | $19.40 | $0.00 | $19.40 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $15.95 | $0.00 | $15.95 |
| OPERATOR: TRACTOR (UTILITY) | $12.25 | $0.23 | $12.48 |
| OPERATOR: ROLLER (FINISHING) | $15.17 | $0.00 | $15.17 |
| OPERATOR: ROLLER | $15.85 | $0.00 | $15.85 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.80 | $0.00 | $16.80 |
| OPERATOR: PAVEMENT PLANER GROUNDSMEN | $14.81 | $0.29 | $15.10 |
| OPERATOR: PAVEMENT PLANER | $17.28 | $0.00 | $17.28 |
| OPERATOR: MILLING MACHINE | $21.13 | $0.00 | $21.13 |
| OPERATOR: MECHANIC | $18.57 | $0.00 | $18.57 |
| OPERATOR: LOADER | $19.36 | $0.00 | $19.36 |
| OPERATOR: GRADER/BLADE, INCLUDES FINISHING | $26.13 | $0.00 | $26.13 |
| OPERATOR: CRANE | $26.68 | $0.00 | $26.68 |
| OPERATOR: BULLDOZER | $19.36 | $0.00 | $19.36 |
| OPERATOR: BROOM/SWEEPER | $12.25 | $0.23 | $12.48 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.53 | $0.00 | $20.53 |
| LABORER: PIPELAYER | $16.75 | $0.00 | $16.75 |
| LABORER: COMMON OR GENERAL | $15.11 | $0.00 | $15.11 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $15.90 | $0.00 | $15.90 |
| IRONWORKER, REINFORCING | $20.80 | $0.00 | $20.80 |
| CEMENT MASON/CONCRETE FINISHER | $19.35 | $0.00 | $19.35 |
| CARPENTER, INCLUDES FORM WORK | $16.52 | $0.00 | $16.52 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.