Heavy construction wages: Danville*, Pittsylvania, Virginia
Wage determination VA20260037 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VA20260037 on · latest revision 1 · verify at sam.gov/wage-determination/VA20260037/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER, INCLUDES ALL DUMP TRUCKS | $15.62 | $0.00 | $15.62 |
| POWER EQUIPMENT OPERATOR: TUGBOAT | $26.78 | $0.00 | $26.78 |
| POWER EQUIPMENT OPERATOR: TRACKHOE | $17.97 | $1.75 | $19.72 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $37.75 | $8.91 | $46.66 |
| POWER EQUIPMENT OPERATOR: CRANE, ALL TYPES | $22.34 | $2.06 | $24.40 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $16.07 | $0.00 | $16.07 |
| POWER EQUIPMENT OPERATOR : LOADER | $16.51 | $2.97 | $19.48 |
| POWER EQUIPMENT OPERATOR : EXCAVATOR | $17.62 | $0.76 | $18.38 |
| POWER EQUIPMENT OPERATOR : BULLDOZER | $29.08 | $10.26 | $39.34 |
| POWER EQUIPMENT OPERATOR : BACKHOE | $16.60 | $3.48 | $20.08 |
| LABORERS PIPELAYER | $14.83 | $4.71 | $19.54 |
| LABORERS LANDSCAPE | $14.10 | $0.00 | $14.10 |
| LABORERS FLAGGER | $10.42 | $0.28 | $10.70 |
| LABORERS COMMON OR GENERAL | $12.63 | $0.00 | $12.63 |
| IRONWORKER, STRUCTURAL | $28.97 | $11.63 | $40.60 |
| IRONWORKER, REINFORCING | $31.64 | $16.70 | $48.34 |
| ELECTRICIAN | $31.12 | $8.88 | $40.00 |
| CEMENT MASON/CONCRETE FINISHER | $26.78 | $5.40 | $32.18 |
| CARPENTER | $18.08 | $1.09 | $19.17 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.