Building construction wages: Augusta, Virginia
Wage determination VA20260014 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VA20260014 on · latest revision 2 · verify at sam.gov/wage-determination/VA20260014/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-10-15 | diff vs rev 1 |
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY.) | $40.77 | $20.17 | $60.94 |
| BOILERMAKER | $38.97 | $27.39 | $66.36 |
| POWER EQUIPMENT OPERATOR: CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND | $40.99 | $18.05 | $59.04 |
| POWER EQUIPMENT OPERATOR: CRANES UNDER 90 TONS | $39.99 | $18.05 | $58.04 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $37.86 | $25.86 | $63.72 |
| PAINTER: SPRAY | $29.16 | $11.86 | $41.02 |
| BRICKLAYER | $23.54 | $6.73 | $30.27 |
| CARPENTER | $14.81 | $2.19 | $17.00 |
| ELECTRICIAN | $19.52 | $5.04 | $24.56 |
| IRONWORKER: REINFORCING | $25.36 | $6.68 | $32.04 |
| LABORER: COMMON OR GENERAL, INCLUDING PIPELAYING | $13.20 | $1.83 | $15.03 |
| LABORER: MASON TENDER - BRICK | $13.41 | $3.15 | $16.56 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.32 | $0.00 | $15.32 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.24 | $0.87 | $17.11 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 | $22.98 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $16.00 | $0.00 | $16.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $19.40 | $7.00 | $26.40 |
| POWER EQUIPMENT OPERATOR: LOADER | $21.28 | $3.17 | $24.45 |
| POWER EQUIPMENT OPERATOR: ROLLER | $16.25 | $4.88 | $21.13 |
| PAINTER: BRUSH AND ROLLER | $20.01 | $0.00 | $20.01 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $23.23 | $9.09 | $32.32 |
| PLUMBER | $20.53 | $7.24 | $27.77 |
| ROOFER | $16.17 | $3.73 | $19.90 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $18.38 | $3.30 | $21.68 |
| TILE FINISHER | $23.40 | $0.00 | $23.40 |
| TILE SETTER | $27.80 | $10.25 | $38.05 |
| TRUCK DRIVER: DUMP TRUCK | $16.58 | $1.73 | $18.31 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.