Building construction wages: Wise, Texas
Wage determination TX20260276 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260276 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260276/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $33.23 | $7.52 | $40.75 |
| BOILERMAKER | $33.17 | $24.92 | $58.09 |
| MILLWRIGHT | $32.02 | $11.27 | $43.29 |
| ELEVATOR MECHANIC | $51.93 | $38.44 | $90.37 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | $32.35 | $13.10 | $45.45 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | $32.85 | $13.10 | $45.95 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $29.64 | $8.43 | $38.07 |
| PAINTER (BRUSH, ROLLER, AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING)) | $16.40 | $5.45 | $21.85 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $41.28 | $12.16 | $53.44 |
| TRUCK DRIVER: WATER TRUCK | $12.00 | $4.11 | $16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 | $0.00 | $12.50 |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 | $28.22 |
| TRUCK DRIVER: DUMP TRUCK | $12.39 | $1.18 | $13.57 |
| TILE SETTER | $12.00 | $0.00 | $12.00 |
| TILE FINISHER | $11.22 | $0.00 | $11.22 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $18.89 | $0.00 | $18.89 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $18.63 | $0.65 | $19.28 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $21.39 | $5.47 | $26.86 |
| ROOFER | $15.70 | $0.58 | $16.28 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $22.19 | $3.94 | $26.13 |
| PLASTERER | $15.30 | $0.00 | $15.30 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $21.04 | $4.34 | $25.38 |
| OPERATOR: ROLLER | $15.04 | $0.00 | $15.04 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $18.44 | $0.00 | $18.44 |
| OPERATOR: MECHANIC | $17.52 | $3.33 | $20.85 |
| OPERATOR: LOADER | $12.89 | $1.19 | $14.08 |
| OPERATOR: GRADER/BLADE | $12.95 | $0.00 | $12.95 |
| OPERATOR: FORKLIFT | $14.20 | $0.00 | $14.20 |
| OPERATOR: DRILL | $17.60 | $0.50 | $18.10 |
| OPERATOR: BULLDOZER | $18.29 | $1.31 | $19.60 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $13.93 | $0.00 | $13.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.06 | $0.00 | $13.06 |
| LABORER: LANDSCAPE AND IRRIGATION | $10.00 | $0.00 | $10.00 |
| LABORER: ROOF TEAROFF | $11.28 | $0.00 | $11.28 |
| LABORER: PIPELAYER | $13.00 | $0.35 | $13.35 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.80 | $0.00 | $10.80 |
| LABORER: MASON TENDER - BRICK | $10.50 | $0.00 | $10.50 |
| LABORER: COMMON OR GENERAL | $10.42 | $0.00 | $10.42 |
| IRONWORKER, REINFORCING | $12.19 | $0.00 | $12.19 |
| INSTALLER - SIDING (METAL/ALUMINUM/VINYL) | $15.77 | $0.00 | $15.77 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | $22.18 | $6.48 | $28.66 |
| GLAZIER | $16.12 | $2.86 | $18.98 |
| FORM WORKER | $12.38 | $0.00 | $12.38 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS/SOUND AND COMMUNICATION SYSTEMS | $20.68 | $4.39 | $25.07 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $14.88 | $2.15 | $17.03 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $18.00 | $0.38 | $18.38 |
| ELECTRICAL INSTALLER (SOUND AND COMMUNICATION SYSTEMS ONLY)EXCLUDES WIRING | $17.79 | $2.41 | $20.20 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $16.20 | $3.40 | $19.60 |
| DRYWALL FINISHER/TAPER | $16.24 | $3.94 | $20.18 |
| CEMENT MASON/CONCRETE FINISHER | $13.45 | $0.00 | $13.45 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $13.30 | $0.00 | $13.30 |
| BRICKLAYER | $20.18 | $0.00 | $20.18 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.