Wage determination TX20260258

Texas · Building · Active · Standard

Kendall

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1) · download CSV

ClassificationRateFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION)$29.50$8.79
BOILERMAKER$33.17$24.92
BRICKLAYER$25.50$8.12
ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY)$37.45$12.19
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$37.45$12.19
ELEVATOR MECHANIC$51.59$38.44
POWER EQUIPMENT OPERATOR (CRANES)$39.47$10.39
IRONWORKER, STRUCTURAL$27.95$8.03
IRONWORKER: ORNAMENTAL$28.26$8.13
PLUMBER (EXCLUDES HVAC PIPE INSTALLATION)$38.97$11.48
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$38.97$11.48
HVAC MECHANIC (ELECTRICAL TEMPERATURE CONTROL INSTALLATION & UNIT INSTALLATION ONLY)$38.97$11.48
SPRINKLER FITTER (FIRE SPRINKLERS)$38.57$24.47
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$34.10$16.10
SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION)$34.10$16.10
TRUCK DRIVER: WATER TRUCK$12.00$4.11
TRUCK DRIVER: SEMI-TRAILER TRUCK$12.50$0.00
TRUCK DRIVER: FLATBED TRUCK$19.65$8.57
TRUCK DRIVER: DUMP TRUCK$12.39$1.18
TILE SETTER$16.09$0.00
TILE FINISHER$11.32$0.00
ROOFER$12.00$0.00
PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING$13.13$0.00
OPERATOR: ROLLER$11.25$0.00
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$16.03$0.00
OPERATOR: MECHANIC$18.75$5.12
OPERATOR: LOADER$13.90$0.00
OPERATOR: GRADER/BLADE$19.30$0.00
OPERATOR: FORKLIFT$13.06$0.00
OPERATOR: DRILL$14.50$0.00
OPERATOR: BULLDOZER$14.00$0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$14.00$0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$19.43$3.49
LABORER: LANDSCAPE AND IRRIGATION$8.00$0.00
LABORER: ROOF TEAROFF$11.28$0.00
LABORER: PIPELAYER$11.00$0.00
LABORER: MASON TENDER - CEMENT/CONCRETE$12.00$0.00
LABORER: MASON TENDER - BRICK$12.00$0.00
LABORER: COMMON OR GENERAL$10.00$0.00
IRONWORKER, REINFORCING$12.27$0.00
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$20.19$3.75
DRYWALL HANGER AND METAL STUD INSTALLER$15.38$0.00
DRYWALL FINISHER/TAPER$13.81$0.00
CEMENT MASON/CONCRETE FINISHER$22.27$5.30
CAULKER$15.00$0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION$14.83$1.73
CARPENTER (FORM WORK ONLY)$13.63$0.00
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$18.00$0.00