Building construction wages: Galveston, Texas
Wage determination TX20260248 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260248 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260248/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $30.20 | $12.38 | $42.58 |
| BOILERMAKER | $33.17 | $24.92 | $58.09 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.27 | $9.73 | $43.00 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) | $35.63 | $14.27 | $49.90 |
| ELEVATOR MECHANIC | $53.59 | $38.44 | $92.03 |
| POWER EQUIPMENT OPERATOR (CRANES) | $39.47 | $10.39 | $49.86 |
| IRONWORKER: ORNAMENTAL | $28.26 | $8.13 | $36.39 |
| PAINTER (BRUSH, ROLLER, AND DRYWALL FINISHING/TAPING) | $17.88 | $9.50 | $27.38 |
| PLASTERER | $31.34 | $10.30 | $41.64 |
| PLUMBER | $39.98 | $11.61 | $51.59 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $42.09 | $12.96 | $55.05 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $29.70 | $13.85 | $43.55 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $29.70 | $13.85 | $43.55 |
| WATERPROOFER | $14.39 | $0.00 | $14.39 |
| TRUCK DRIVER: WATER TRUCK | $12.00 | $4.11 | $16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 | $0.00 | $12.50 |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 | $28.22 |
| TRUCK DRIVER: DUMP TRUCK | $12.39 | $1.18 | $13.57 |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK | $14.95 | $5.23 | $20.18 |
| TILE SETTER | $16.17 | $0.00 | $16.17 |
| TILE FINISHER | $12.00 | $0.00 | $12.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $18.62 | $3.03 | $21.65 |
| ROOFER | $15.40 | $0.00 | $15.40 |
| PAINTER: SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $17.43 | $4.43 | $21.86 |
| OPERATOR: ROLLER | $16.00 | $0.00 | $16.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.03 | $0.00 | $16.03 |
| OPERATOR: MECHANIC | $17.52 | $3.33 | $20.85 |
| OPERATOR: LOADER | $13.55 | $0.94 | $14.49 |
| OPERATOR: GRADER/BLADE | $13.37 | $0.00 | $13.37 |
| OPERATOR: FORKLIFT | $15.64 | $0.00 | $15.64 |
| OPERATOR: DRILL | $16.22 | $0.34 | $16.56 |
| OPERATOR: BULLDOZER | $20.77 | $0.00 | $20.77 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $13.93 | $0.00 | $13.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.10 | $0.00 | $14.10 |
| LATHER | $20.11 | $0.00 | $20.11 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.49 | $0.00 | $9.49 |
| LABORER: ROOF TEAROFF | $11.28 | $0.00 | $11.28 |
| LABORER: PIPELAYER | $12.94 | $0.00 | $12.94 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.50 | $0.00 | $10.50 |
| LABORER: MASON TENDER - BRICK | $13.37 | $0.00 | $13.37 |
| LABORER: COMMON OR GENERAL | $11.47 | $0.00 | $11.47 |
| IRONWORKER, STRUCTURAL | $25.37 | $6.00 | $31.37 |
| IRONWORKER, REINFORCING | $12.10 | $0.00 | $12.10 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | $17.40 | $0.00 | $17.40 |
| GLAZIER | $17.09 | $3.41 | $20.50 |
| FORM WORKER | $12.07 | $0.00 | $12.07 |
| FLOOR LAYER: CARPET | $20.00 | $0.00 | $20.00 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $19.23 | $3.55 | $22.78 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $17.97 | $3.37 | $21.34 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $17.88 | $5.24 | $23.12 |
| CEMENT MASON/CONCRETE FINISHER | $13.82 | $0.00 | $13.82 |
| CAULKER | $15.36 | $0.00 | $15.36 |
| BRICKLAYER | $19.86 | $0.00 | $19.86 |
| ACOUSTICAL CEILING MECHANIC | $16.41 | $3.98 | $20.39 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.