Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $30.20 | $12.38 | $42.58 |
| BOILERMAKER | $33.17 | $24.92 | $58.09 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION,DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.27 | $9.73 | $43.00 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) | $38.50 | $10.71 | $49.21 |
| ELEVATOR MECHANIC | $53.59 | $38.44 | $92.03 |
| POWER EQUIPMENT OPERATOR (CRANES) | $39.47 | $10.39 | $49.86 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $28.26 | $8.13 | $36.39 |
| PLASTERER | $31.34 | $10.30 | $41.64 |
| PLUMBER | $39.98 | $11.61 | $51.59 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $42.09 | $12.96 | $55.05 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $29.70 | $13.85 | $43.55 |
| WATERPROOFER | $14.39 | $0.00 | $14.39 |
| TRUCK DRIVER: WATER TRUCK | $12.00 | $4.11 | $16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 | $0.00 | $12.50 |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 | $28.22 |
| TRUCK DRIVER: DUMP TRUCK | $12.39 | $1.18 | $13.57 |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK | $14.95 | $5.23 | $20.18 |
| TILE SETTER | $16.17 | $0.00 | $16.17 |
| TILE FINISHER | $12.00 | $0.00 | $12.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $22.17 | $9.70 | $31.87 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $16.00 | $1.61 | $17.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $17.81 | $2.64 | $20.45 |
| ROOFER | $15.40 | $0.00 | $15.40 |
| PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING | $16.77 | $4.51 | $21.28 |
| OPERATOR: ROLLER | $16.00 | $0.00 | $16.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.03 | $0.00 | $16.03 |
| OPERATOR: MECHANIC | $17.52 | $3.33 | $20.85 |
| OPERATOR: LOADER | $13.55 | $0.94 | $14.49 |
| OPERATOR: GRADER/BLADE | $13.37 | $0.00 | $13.37 |
| OPERATOR: FORKLIFT | $15.64 | $0.00 | $15.64 |
| OPERATOR: DRILL | $16.22 | $0.34 | $16.56 |
| OPERATOR: BULLDOZER | $20.77 | $0.00 | $20.77 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $13.93 | $0.00 | $13.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.10 | $0.00 | $14.10 |
| LATHER | $19.73 | $0.00 | $19.73 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.49 | $0.00 | $9.49 |
| LABORER: ROOF TEAROFF | $11.28 | $0.00 | $11.28 |
| LABORER: PIPELAYER | $12.94 | $0.00 | $12.94 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.50 | $0.00 | $10.50 |
| LABORER: MASON TENDER - BRICK | $13.37 | $0.00 | $13.37 |
| LABORER: COMMON OR GENERAL | $10.79 | $0.00 | $10.79 |
| IRONWORKER, REINFORCING | $12.10 | $0.00 | $12.10 |
| INSULATOR - BATT | $14.87 | $0.73 | $15.60 |
| GLAZIER | $19.12 | $4.41 | $23.53 |
| FORM WORKER | $11.87 | $0.00 | $11.87 |
| FLOOR LAYER: CARPET | $20.00 | $0.00 | $20.00 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $18.00 | $1.68 | $19.68 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $17.97 | $3.37 | $21.34 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $17.45 | $3.96 | $21.41 |
| DRYWALL FINISHER/TAPER | $16.30 | $3.71 | $20.01 |
| CEMENT MASON/CONCRETE FINISHER | $13.82 | $0.00 | $13.82 |
| CAULKER | $15.36 | $0.00 | $15.36 |
| BRICKLAYER | $19.86 | $0.00 | $19.86 |
| ACOUSTICAL CEILING MECHANIC | $16.41 | $3.98 | $20.39 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.