Building construction wages: Carson, Texas

Wage determination TX20260237 · Active · Standard · verify on SAM.gov

Carson

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 1 removed.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
BOILERMAKER$33.17$24.92$58.09
CARPENTER$28.57$9.30$37.87
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS)$29.41$12.73$42.14
POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER)$32.35$13.10$45.45
POWER EQUIPMENT OPERATOR ((1) TOWER CRANE)$32.85$13.10$45.95
IRONWORKER: ORNAMENTAL$28.26$8.13$36.39
IRONWORKER, STRUCTURAL$29.64$8.43$38.07
PLUMBER$28.64$10.65$39.29
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$26.72$12.13$38.85
TRUCK DRIVER: WATER TRUCK$12.00$4.11$16.11
TRUCK DRIVER: SEMI-TRAILER TRUCK$12.50$0.00$12.50
TRUCK DRIVER: FLATBED TRUCK$19.65$8.57$28.22
TRUCK DRIVER: DUMP TRUCK$12.39$1.18$13.57
TILE SETTER$14.00$2.01$16.01
TILE FINISHER$11.22$0.00$11.22
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION$21.13$6.53$27.66
ROOFER$13.75$0.00$13.75
PAINTER: DRYWALL FINISHING/TAPING ONLY$14.71$0.00$14.71
PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING$14.27$0.00$14.27
OPERATOR: ROLLER$12.70$0.00$12.70
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$16.03$0.00$16.03
OPERATOR: MECHANIC$17.52$3.33$20.85
OPERATOR: LOADER$13.55$0.94$14.49
OPERATOR: GRADER/BLADE$13.37$0.00$13.37
OPERATOR: FORKLIFT$14.83$0.00$14.83
OPERATOR: DRILL$16.22$0.34$16.56
OPERATOR: BULLDOZER$18.29$1.31$19.60
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$13.93$0.00$13.93
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$14.25$0.00$14.25
LABORER: ROOF TEAROFF$11.28$0.00$11.28
LABORER: PIPELAYER$12.49$2.13$14.62
LABORER: MASON TENDER - CEMENT/CONCRETE$10.58$0.00$10.58
LABORER: MASON TENDER - BRICK$11.36$0.00$11.36
LABORER: COMMON OR GENERAL$12.34$0.00$12.34
IRONWORKER, REINFORCING$12.27$0.00$12.27
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)$19.77$7.13$26.90
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$15.51$3.15$18.66
ELECTRICAL INSTALLER (ALARMS) (EXCLUDES WIRING)$18.68$2.87$21.55
CEMENT MASON/CONCRETE FINISHER$19.60$0.00$19.60
BRICKLAYER$20.04$0.00$20.04