Building construction wages: San Saba, Schleicher, Sterling, Texas
Wage determination TX20260219 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260219 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260219/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (STERLING COUNTY) | $33.23 | $7.52 | $40.75 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (SAN SABA AND SCHLEICHER COUNTIES) | $30.50 | $8.89 | $39.39 |
| BOILERMAKER (SAN SABA COUNTY) | $33.17 | $24.92 | $58.09 |
| BOILERMAKER (SCHLEICHER AND STERLING COUNTIES) | $33.70 | $24.41 | $58.11 |
| IRONWORKER, REINFORCING AND STRUCTURAL (SCHLEICHER COUNTY) | $27.95 | $8.03 | $35.98 |
| IRONWORKER, REINFORCING AND STRUCTURAL (STERLING COUNTY) | $29.64 | $8.43 | $38.07 |
| IRONWORKER, STRUCTURAL AND REINFORCING (SAN SABA COUNTY) | $28.30 | $8.23 | $36.53 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (SAN SABA AND SCHLEICHER COUNTIES) | $25.27 | $9.57 | $34.84 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (STERLING COUNTY) | $25.27 | $9.57 | $34.84 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (SAN SABA COUNTY) | $37.15 | $16.92 | $54.07 |
| PLUMBER | $28.64 | $10.65 | $39.29 |
| TRUCK DRIVER | $11.24 | $0.35 | $11.59 |
| TILE SETTER | $15.00 | $0.00 | $15.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $17.00 | $0.00 | $17.00 |
| ROOFER | $13.64 | $1.80 | $15.44 |
| PLASTERER | $15.50 | $0.00 | $15.50 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.26 | $0.00 | $12.26 |
| OPERATOR: LOADER (FRONT END) | $10.54 | $0.00 | $10.54 |
| OPERATOR: FORKLIFT | $14.58 | $0.00 | $14.58 |
| OPERATOR: CRANE | $21.33 | $0.00 | $21.33 |
| OPERATOR: BULLDOZER | $12.80 | $0.43 | $13.23 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.75 | $0.00 | $13.75 |
| LABORER: PLASTER TENDER | $9.00 | $0.00 | $9.00 |
| LABORER: MORTAR MIXER | $12.00 | $0.00 | $12.00 |
| LABORER: MASON TENDER - BRICK | $12.02 | $0.00 | $12.02 |
| LABORER: LANDSCAPE & IRRIGATION | $8.50 | $0.22 | $8.72 |
| LABORER: COMMON OR GENERAL | $9.73 | $0.00 | $9.73 |
| INSTALLER - OVERHEAD DOOR | $11.63 | $6.26 | $17.89 |
| HVAC MECHANIC (HVAC DUCT AND PIPE INSTALLATION) | $14.21 | $0.77 | $14.98 |
| GLAZIER | $17.20 | $1.59 | $18.79 |
| ELECTRICIAN | $20.00 | $3.11 | $23.11 |
| CEMENT MASON/CONCRETE FINISHER | $13.27 | $0.00 | $13.27 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $0.00 | $13.13 |
| BRICKLAYER | $19.67 | $0.00 | $19.67 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.