Building construction wages: Menard + 3 more counties, Texas
Wage determination TX20260217 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260217 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260217/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MITCHELL AND NOLAN COUNTIES) | $33.23 | $7.52 | $40.75 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MENARD AND MILLS COUNTIES) | $30.50 | $8.89 | $39.39 |
| BOILERMAKER (MILLS COUNTY) | $33.17 | $24.92 | $58.09 |
| BOILERMAKER (MENARD, MITCHELL AND NOLAN COUNTIES) | $33.70 | $24.41 | $58.11 |
| IRONWORKER, REINFORCING AND STRUCTURAL (MENARD COUNTY) | $27.95 | $8.03 | $35.98 |
| IRONWORKER, REINFORCING AND STRUCTURAL (MILLS, MITCHELL, AND NOLAN COUNTIES) | $29.64 | $8.43 | $38.07 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (MENARD COUNTY) | $25.27 | $9.57 | $34.84 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (MITCHELL COUNTY) | $25.27 | $9.57 | $34.84 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (MILLS AND NOLAN COUNTY) | $25.27 | $9.57 | $34.84 |
| PLUMBER | $28.64 | $10.65 | $39.29 |
| TRUCK DRIVER | $11.24 | $0.35 | $11.59 |
| TILE SETTER | $15.00 | $0.00 | $15.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $17.00 | $0.00 | $17.00 |
| ROOFER | $13.64 | $1.80 | $15.44 |
| PLASTERER | $15.50 | $0.00 | $15.50 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.26 | $0.00 | $12.26 |
| OPERATOR: LOADER (FRONT END) | $10.54 | $0.00 | $10.54 |
| OPERATOR: FORKLIFT | $14.58 | $0.00 | $14.58 |
| OPERATOR: CRANE | $21.33 | $0.00 | $21.33 |
| OPERATOR: BULLDOZER | $12.80 | $0.43 | $13.23 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.75 | $0.00 | $13.75 |
| LABORER: PLASTER TENDER | $9.00 | $0.00 | $9.00 |
| LABORER: MORTAR MIXER | $12.00 | $0.00 | $12.00 |
| LABORER: MASON TENDER - BRICK | $12.02 | $0.00 | $12.02 |
| LABORER: LANDSCAPE & IRRIGATION | $8.50 | $0.22 | $8.72 |
| LABORER: COMMON OR GENERAL | $9.73 | $0.00 | $9.73 |
| INSTALLER - OVERHEAD DOOR | $11.63 | $6.26 | $17.89 |
| HVAC MECHANIC (HVAC DUCT AND PIPE INSTALLATION) | $14.21 | $0.77 | $14.98 |
| GLAZIER | $17.20 | $1.59 | $18.79 |
| ELECTRICIAN | $20.00 | $3.11 | $23.11 |
| CEMENT MASON/CONCRETE FINISHER | $13.27 | $0.00 | $13.27 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $0.00 | $13.13 |
| BRICKLAYER | $19.67 | $0.00 | $19.67 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.