Building construction wages: Lee + 5 more counties, Texas
Wage determination TX20260213 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260213 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260213/1
LeeNewtonSan AugustineShelbyWashingtonLimestone
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT AND FROST INSULATOR/ASBESTOS WORKER (LIMESTONE, SAN AUGUSTINE, AND SHELBY COUNTIES) | $33.23 | $7.52 | $40.75 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.20 | $12.38 | $42.58 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (NEWTON COUNTY) | $32.66 | $9.86 | $42.52 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (LEE COUNTY) | $30.50 | $8.89 | $39.39 |
| BOILERMAKER (LEE, LIMESTONE, AND WASHINGTON COUNTIES) | $33.17 | $24.92 | $58.09 |
| BOILERMAKER (NEWTON, SAN AUGUSTINE, AND SHELBY COUNTIES) | $33.17 | $24.92 | $58.09 |
| CARPENTER (FORM WORK ONLY) | $33.27 | $9.73 | $43.00 |
| IRONWORKER, STRUCTURAL AND REINFORCING (WASHINGTON COUNTY) | $28.26 | $8.13 | $36.39 |
| IRONWORKER, REINFORCING AND STRUCTURAL (NEWTON AND SAN AUGUSTINE COUNTIES) | $34.35 | $14.44 | $48.79 |
| IRONWORKER, REINFORCING AND STRUCTURAL (SHELBY COUNTY) | $29.64 | $8.43 | $38.07 |
| IRONWORKER, STRUCTURAL AND REINFORCING (LEE AND LIMESTONE COUNTIES) | $28.30 | $8.23 | $36.53 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (LEE COUNTY) | $25.27 | $9.57 | $34.84 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (NEWTON, SAN AUGUSTINE, AND WASHINGTON COUNTIES) | $25.27 | $9.57 | $34.84 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (LIMESTONE AND SHELBY COUNTIES) | $25.27 | $9.57 | $34.84 |
| PLUMBER (NEWTON, SAN AUGUSTINE, & SHELBY COUNTIES) | $39.98 | $11.61 | $51.59 |
| PLUMBER (LEE & WASHINGTON COUNTIES) | $39.98 | $11.61 | $51.59 |
| PLUMBER (SAN AUGUSTINE & SHELBY COUNTIES) | $39.76 | $14.04 | $53.80 |
| PLUMBER (LIMESTONE COUNTY) | $32.85 | $12.74 | $45.59 |
| TRUCK DRIVER | $10.68 | $0.34 | $11.02 |
| TILE SETTER | $15.00 | $0.00 | $15.00 |
| SHEET METAL WORKER | $17.00 | $0.00 | $17.00 |
| ROOFER | $13.64 | $1.80 | $15.44 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $11.75 | $0.00 | $11.75 |
| OPERATOR: LOADER (FRONT END) | $10.54 | $0.00 | $10.54 |
| OPERATOR: FORKLIFT | $14.58 | $0.00 | $14.58 |
| OPERATOR: CRANE | $21.33 | $0.00 | $21.33 |
| OPERATOR: BULLDOZER | $13.00 | $0.35 | $13.35 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.67 | $0.47 | $15.14 |
| LABORER: MORTAR MIXER | $12.00 | $0.00 | $12.00 |
| LABORER: MASON TENDER - BRICK | $12.02 | $0.00 | $12.02 |
| LABORER: LANDSCAPE & IRRIGATION | $8.50 | $0.22 | $8.72 |
| LABORER: COMMON OR GENERAL | $9.24 | $0.00 | $9.24 |
| ELECTRICIAN | $18.06 | $4.87 | $22.93 |
| DRYWALL HANGER | $13.89 | $1.00 | $14.89 |
| CEMENT MASON/CONCRETE FINISHER | $12.09 | $0.00 | $12.09 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, AND METAL STUD INSTALLATION (EXCLUDES DRYWALL HANGING, AND FORM WORK) | $15.13 | $2.63 | $17.76 |
| BRICKLAYER | $18.00 | $0.00 | $18.00 |