Building construction wages: Hutchinson, Roberts, Texas
Wage determination TX20260207 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260207 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260207/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $33.23 | $7.52 | $40.75 |
| BOILERMAKER | $33.17 | $24.92 | $58.09 |
| CARPENTER | $28.57 | $9.30 | $37.87 |
| IRONWORKER: REINFORCING | $29.64 | $8.43 | $38.07 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE | $25.27 | $9.57 | $34.84 |
| PLUMBER | $28.64 | $10.65 | $39.29 |
| TRUCK DRIVER | $11.24 | $0.35 | $11.59 |
| TILE SETTER | $15.00 | $0.00 | $15.00 |
| SHEET METAL WORKER | $17.00 | $0.00 | $17.00 |
| ROOFER | $13.64 | $1.80 | $15.44 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.26 | $0.00 | $12.26 |
| OPERATOR: LOADER (FRONT END) | $10.54 | $0.00 | $10.54 |
| OPERATOR: FORKLIFT | $14.58 | $0.00 | $14.58 |
| OPERATOR: CRANE | $21.33 | $0.00 | $21.33 |
| OPERATOR: BULLDOZER | $12.80 | $0.43 | $13.23 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.75 | $0.00 | $13.75 |
| LABORER: MORTAR MIXER | $12.00 | $0.00 | $12.00 |
| LABORER: MASON TENDER - BRICK | $12.02 | $0.00 | $12.02 |
| LABORER: LANDSCAPE & IRRIGATION | $8.50 | $0.22 | $8.72 |
| LABORER: COMMON OR GENERAL | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN | $18.06 | $4.87 | $22.93 |
| CEMENT MASON/CONCRETE FINISHER | $13.27 | $0.00 | $13.27 |
| BRICKLAYER | $19.46 | $0.00 | $19.46 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.