Building construction wages: Tyler, Trinity, Freestone, Texas
Wage determination TX20260201 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260201 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260201/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT AND FROST INSULATOR/ASBESTOS WORKER (FREESTONE, AND TRINITY COUNTIES) | $33.23 | $7.52 | $40.75 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.20 | $12.38 | $42.58 |
| BOILERMAKER (FREESTONE COUNTY) | $33.17 | $24.92 | $58.09 |
| BOILERMAKER (TRINITY AND TYLER COUNTIES) | $33.17 | $24.92 | $58.09 |
| CARPENTER (FORM WORK ONLY) | $33.27 | $9.73 | $43.00 |
| IRONWORKER, STRUCTURAL AND REINFORCING (TRINITY COUNTY) | $28.26 | $8.13 | $36.39 |
| IRONWORKER, REINFORCING AND STRUCTURAL (TYLER COUNTY) | $34.35 | $14.44 | $48.79 |
| IRONWORKER, REINFORCING AND STRUCTURAL (FREESTONE COUNTY) | $29.64 | $8.43 | $38.07 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (TRINITY AND TYLER COUNTIES) | $25.27 | $9.57 | $34.84 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (FREESTONE COUNTY) | $25.27 | $9.57 | $34.84 |
| PLUMBER | $35.96 | $11.68 | $47.64 |
| PLUMBER (FREESTONE COUNTY) | $32.85 | $12.74 | $45.59 |
| TRUCK DRIVER | $10.68 | $0.34 | $11.02 |
| TILE SETTER | $15.00 | $0.00 | $15.00 |
| SHEET METAL WORKER | $17.00 | $0.00 | $17.00 |
| ROOFER | $13.64 | $1.80 | $15.44 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $11.75 | $0.00 | $11.75 |
| OPERATOR: LOADER (FRONT END) | $10.54 | $0.00 | $10.54 |
| OPERATOR: FORKLIFT | $14.58 | $0.00 | $14.58 |
| OPERATOR: CRANE | $21.33 | $0.00 | $21.33 |
| OPERATOR: BULLDOZER | $13.00 | $0.35 | $13.35 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.67 | $0.47 | $15.14 |
| LABORER: MORTAR MIXER | $12.00 | $0.00 | $12.00 |
| LABORER: MASON TENDER - BRICK | $12.02 | $0.00 | $12.02 |
| LABORER: LANDSCAPE & IRRIGATION | $8.50 | $0.22 | $8.72 |
| LABORER: COMMON OR GENERAL | $9.24 | $0.00 | $9.24 |
| ELECTRICIAN | $18.06 | $4.87 | $22.93 |
| DRYWALL HANGER | $13.89 | $1.00 | $14.89 |
| CEMENT MASON/CONCRETE FINISHER | $12.09 | $0.00 | $12.09 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, AND METAL STUD INSTALLATION (EXCLUDES DRYWALL HANGING, AND FORM WORK) | $15.13 | $2.63 | $17.76 |
| BRICKLAYER | $18.00 | $0.00 | $18.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.