Building construction wages: Van Zandt, Texas
Wage determination TX20260187 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260187 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260187/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.50 | $8.89 | $39.39 |
| BOILERMAKER | $33.17 | $24.92 | $58.09 |
| IRONWORKER, REINFORCING | $29.64 | $8.43 | $38.07 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE | $25.27 | $9.57 | $34.84 |
| TRUCK DRIVER | $12.52 | $0.00 | $12.52 |
| TILE SETTER | $15.00 | $0.00 | $15.00 |
| SHEET METAL WORKER | $17.00 | $0.00 | $17.00 |
| ROOFER | $13.64 | $1.80 | $15.44 |
| PLUMBER | $20.38 | $4.74 | $25.12 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.50 | $0.00 | $13.50 |
| OPERATOR: LOADER (FRONT END) | $10.54 | $0.00 | $10.54 |
| OPERATOR: FORKLIFT | $14.58 | $0.00 | $14.58 |
| OPERATOR: CRANE | $21.33 | $0.00 | $21.33 |
| OPERATOR: BULLDOZER | $13.00 | $0.31 | $13.31 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $11.00 | $0.00 | $11.00 |
| LABORER: MORTAR MIXER | $12.00 | $0.00 | $12.00 |
| LABORER: MASON TENDER - BRICK | $12.02 | $0.00 | $12.02 |
| LABORER: LANDSCAPE & IRRIGATION | $8.50 | $0.22 | $8.72 |
| LABORER: COMMON OR GENERAL | $9.73 | $0.00 | $9.73 |
| IRONWORKER, STRUCTURAL | $15.48 | $0.00 | $15.48 |
| ELECTRICIAN | $18.06 | $4.87 | $22.93 |
| CEMENT MASON/CONCRETE FINISHER | $13.29 | $0.00 | $13.29 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $0.00 | $14.30 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.