Heavy construction wages: Bosque, Texas
Wage determination TX20260070 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260070 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260070/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $10.80 | $0.26 | $11.06 |
| OPERATOR: LOADER (FRONT END) | $12.50 | $0.00 | $12.50 |
| OPERATOR: BULLDOZER | $14.25 | $0.00 | $14.25 |
| OPERATOR: BACKHOE/TRACKHOE | $11.75 | $0.00 | $11.75 |
| LABORER: PIPELAYER | $9.94 | $0.00 | $9.94 |
| LABORER: COMMON OR GENERAL | $8.61 | $0.00 | $8.61 |
| CEMENT MASON/CONCRETE FINISHER | $13.00 | $0.00 | $13.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.