Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ELEVATOR MECHANIC$53.59$38.44$92.03
SPRINKLER FITTER (FIRE SPRINKLERS)$36.15$24.47$60.62
SHEETMETAL WORKER (EXCLUDING HVAC WORK)$29.70$13.85$43.55
TRUCK DRIVERS$13.43$0.00$13.43
TILE SETTER$14.08$0.00$14.08
SOFT FLOOR LAYERS, CARPET AND VINYL$14.50$0.00$14.50
SHEET METAL WORKER (HVAC DUCT ONLY)$12.76$1.95$14.71
ROOFERS$10.00$0.00$10.00
POWER EQUIPMENT OPERATOR: FORKLIFT$12.54$0.00$12.54
POWER EQUIPMENT OPERATOR (GRADER)$13.67$0.00$13.67
POWER EQUIPMENT OPERATOR (FRONT END LOADER)$12.00$0.69$12.69
POWER EQUIPMENT OPERATOR (BULLDOZER)$12.67$0.69$13.36
POWER EQUIPMENT OPERATOR (BACKHOE)$13.55$0.69$14.24
PLUMBERS (EXCLUDING HVAC PIPE)$17.96$1.15$19.11
PLASTERER$16.60$0.00$16.60
PAINTER: PARKING LOT STRIPING$14.21$0.00$14.21
PAINTER: BRUSH, ROLLER, AND SPRAY$11.41$0.00$11.41
LABORERS: PLASTER TENDER$11.10$0.00$11.10
LABORERS: MASON TENDER CEMENT$9.46$0.68$10.14
LABORERS: MASON TENDER BRICK$9.97$0.68$10.65
LABORERS: LANDSCAPE AND IRRIGATION$9.02$0.00$9.02
LABORERS: (PIPELAYER)$10.06$0.00$10.06
LABORERS: (COMMON)$8.88$1.10$9.98
IRONWORKER (STRUCTURAL)$17.21$0.00$17.21
IRONWORKER (REINFORCING)$11.25$2.35$13.60
IRONWORKER (ORNAMENTAL)$16.29$0.00$16.29
HVAC MECHANIC (PIPE & SYSTEM INSTALLATION ONLY)$12.82$0.00$12.82
GUTTER AND SIDING INSTALLER$18.59$1.41$20.00
ELECTRICIAN(INCL. LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS)$17.05$6.32$23.37
DRYWALL HANGER$12.71$0.00$12.71
DRYWALL FINISHERS$12.00$0.00$12.00
CEMENT MANSON/CONCRETE FINISHER$13.68$0.75$14.43
CARPORT STRUCTURAL SUPPORTS INSTALLER$11.46$2.61$14.07
CARPENTER (INCLUDES BATT/BLOWN INSULATION, FORMWORK & OVERHEAD DOOR INSTALLATION$12.06$1.41$13.47
BRICKLAYER$15.00$0.00$15.00
ACOUSTICAL CEILING INSTALLER$12.50$0.00$12.50