Residential construction wages: Fort Bend, Texas
Wage determination TX20260066 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260066 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260066/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELEVATOR MECHANIC | $53.59 | $38.44 | $92.03 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $36.15 | $24.47 | $60.62 |
| SHEETMETAL WORKER (EXCLUDING HVAC WORK) | $29.70 | $13.85 | $43.55 |
| TRUCK DRIVERS | $15.12 | $0.00 | $15.12 |
| TILE SETTER | $14.23 | $0.00 | $14.23 |
| SOFT FLOOR LAYERS, CARPET AND VINYL | $16.92 | $0.00 | $16.92 |
| ROOFERS | $10.00 | $0.00 | $10.00 |
| POWER EQUIPMENT OPERATORS: GRADER | $13.67 | $0.00 | $13.67 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $12.00 | $0.69 | $12.69 |
| POWER EQUIPMENT OPERATORS: FORKLIFT | $13.58 | $0.00 | $13.58 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $12.68 | $0.00 | $12.68 |
| POWER EQUIPMENT OPERATORS: BACKHOE | $13.06 | $0.69 | $13.75 |
| PLUMBERS (EXCLUDING HVAC PIPE) | $17.49 | $1.15 | $18.64 |
| PLASTERER | $15.89 | $0.00 | $15.89 |
| PAINTER: PARKING LOT STRIPING | $14.21 | $0.00 | $14.21 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $11.02 | $0.00 | $11.02 |
| LABORERS: PLASTER TENDER | $11.10 | $0.00 | $11.10 |
| LABORERS: PIPELAYER | $10.01 | $0.00 | $10.01 |
| LABORERS: MASON TENDER CEMENT | $10.73 | $0.68 | $11.41 |
| LABORERS: MASON TENDER BRICK | $9.87 | $0.68 | $10.55 |
| LABORERS: LANDSCAPE AND IRRIGATION | $7.54 | $0.00 | $7.54 |
| LABORERS: COMMON | $9.04 | $0.00 | $9.04 |
| IRONWORKER (STRUCTURAL) | $17.21 | $0.00 | $17.21 |
| IRONWORKER (REINFORCING) | $11.25 | $2.35 | $13.60 |
| IRONWORKER (ORNAMENTAL) | $17.17 | $0.00 | $17.17 |
| HVAC MECHANIC (DUCT, PIPE & INSTALLATION OF SYSTEM) | $11.11 | $0.00 | $11.11 |
| GUTTER AND SIDING INSTALLER | $12.84 | $0.00 | $12.84 |
| FORM WORKER | $9.67 | $0.00 | $9.67 |
| ELECTRICIAN(INCL. LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) | $14.81 | $0.00 | $14.81 |
| DRYWALL HANGER | $12.03 | $0.00 | $12.03 |
| DRYWALL FINISHERS | $11.21 | $0.00 | $11.21 |
| CEMENT MASON/CONCRETE FINISHER | $15.20 | $0.00 | $15.20 |
| CARPORT STRUCTURAL SUPPORTS INSTALLER | $11.46 | $2.61 | $14.07 |
| CARPENTER (INCLUDES BATT/BLOWN INSULATION, FORMWORK & OVERHEAD DOOR INSTALLATION | $11.59 | $1.41 | $13.00 |
| BRICKLAYER | $16.87 | $0.00 | $16.87 |
| ACOUSTICAL CEILING INSTALLER | $12.50 | $0.00 | $12.50 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.