Heavy construction wages: Hardin, Jefferson, Orange, Texas
Wage determination TX20260053 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260053 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260053/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $33.76 | $13.56 | $47.32 |
| TRUCK DRIVERS: DUMP | $10.00 | $0.00 | $10.00 |
| POWER EQUIPMENT OPERATORS: TRACKHOE | $15.60 | $0.00 | $15.60 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $10.63 | $0.00 | $10.63 |
| POWER EQUIPMENT OPERATORS: CRANE | $13.77 | $0.00 | $13.77 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $15.00 | $0.00 | $15.00 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $15.55 | $1.89 | $17.44 |
| PLUMBER | $18.28 | $4.69 | $22.97 |
| PILEDRIVERMAN | $13.65 | $0.00 | $13.65 |
| PAINTERS: (SPRAY AND BRUSH) | $12.07 | $0.00 | $12.07 |
| LABORERS: (PIPELAYER) | $8.29 | $0.00 | $8.29 |
| LABORERS: (COMMON) | $7.41 | $0.00 | $7.41 |
| CONCRETE FINISHER | $13.50 | $0.00 | $13.50 |
| CARPENTERS: ALL OTHER WORK | $13.56 | $0.00 | $13.56 |
| CARPENTERS: (FORM BUILDING/FORM SETTING) | $13.15 | $0.00 | $13.15 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.