Heavy construction wages: Jefferson, Orange, Texas

Wage determination TX20260052 · Active · Standard · verify on SAM.gov

JeffersonOrange

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 1 added.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
TRUCK DRIVER$7.25$0.00$7.25
PILEDRIVERMAN$11.26$0.85$12.11
PILEDRIVER$7.25$0.00$7.25
OILER$7.25$0.00$7.25
LIGHT EQUIPMENT OPERATOR (AIR COMPRESSOR, BLADE GRADER (TOWED), FLEXPLANE, FORM GRADER, MIXER (LESS THAN 14 CU. FT.), PUMPS PULSOMETER, TRUCK CRANE DRIVER, GASOLINE OR DIESEL DRIVEN WELDING MACHINES (3 TO 6 MACHINES), HOIST (SINGLE DRUM), SCRAPERS (3 CU. YDS. OR LESS))$7.25$0.00$7.25
LABORER$7.25$0.00$7.25
HEAVY EQUIPMENT OPERATOR (HEAVY DUTY MECHANIC, BLADE GRADER (SELF-PROPELLED), BULL CLAM, BACKFILLER, DERRICK (POWER OPERATED, ALL TYPES); DRAGLINE, PUSH CAT OPERATOR; BULLDOZER & ALL TYPES OF CAT TRACTORS; CABLE-WAY; BACKHOE, SHOVEL, CRANE (POWER OPERATED, ALL TYPES), ELEVATING GRADER (SELF-PROPELLED), HOIST (MOTOR DRIVEN 2 DRUMS OR MORE), MIX MOBILE, WINCH TRUCK, LOCOMOTIVE CRANE, MIXER (14 CUBIC FEET OR MORE), PAVING MIXER (ALL SIZES), SCRAPER (HEAVY TYPE OVER 3 CY), TRENCH MACHINE (ALL$7.25$0.00$7.25
CARPENTER$10.97$0.90$11.87

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.